SLED Opportunity · SOUTH CAROLINA · STATE OF SOUTH CAROLINA
AI Summary
The Winnsboro Connector Project in South Carolina involves constructing approximately 28,050 LF of 16-inch forcemain, 1,672 LF of 10-inch waterline, and 2,250 LF of 24-inch forcemain. Funded by the SCIIP, the bid is due by November 7, 2024, at 1:00 PM. Contact Laura Stritzinger at American Engineering Consultants for more information.
Division III- Construction of approximately 28,050 linear feet (LF) of 16 inch forcemain, 1,672 linear feet of 10-inch waterline and 2,250 linear feet of 24-inch forcemain. Funded in whole or in part by the South Carolina Infrastructure Investment Program (SCIIP), administered by the RIA. All federal SCIIP requirements will apply to the contract. SCIIP Grant No. A-23-R068. Posted on behalf of Owner: Fairfield Joint Water & Sewer System
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.