The Winter Street Improvement Project 2026 in Bridgewater, MA involves removal of old drainage infrastructure, installation of new reinforced concrete drainage systems, and full depth roadway reconstruction and realignment. A pre-bid conference is scheduled for January 28, 2026.
removal and abandonment of deteriorating corrugated metal pipe (CMP) drainage infrastructure. The installation of a new roadway drainage system consisting of reinforced concrete pipe (RCP), precast drainage manholes, precast catchbasins, headwalls and precast drywells and appurtenances within a major Town roadway. Existing catchbasins will also be removed and disposed of and drain manholes will be abandoned in place. This project also includes full depth roadway reconstruction and re-alignment Pre Bid Conference: On Wednesday, January 28, 2026, at 11:00 AM, the Town of Bridgewater will conduct a Pre-Bid Conference and site showing. Attendance at the site showing is optional.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.