Active SLED Opportunity · CALIFORNIA · CITY OF OCEANSIDE
AI Summary
City of Oceanside seeks bids for the Wisconsin Trail Restoration and Sewer Stabilization Project involving trail restoration, excavation, permeable pavers, and concrete embankment installation. Electronic bids due April 29, 2026.
The work inculdes restoring approximately 13 by 16 square feet of existing walking trail, including excavation, compaction, backfill, installation of geotextile fabric, concrete embankment, stone, mortar, permeable pavers, and grouting. **Project Type**: RFB - Request for Bid (Formal) **Source ID**: PU.AG.USA.2501666.C14918776 **Piggyback Contract**: No **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: City of Oceanside Water **Reference Number**: 0000417357 **Pricing**: Lump sum **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Recommended | Event date: 04/08/2026 01:00 PM EDT | Location: behind 815 S Pacific Street, Oceanside CA 92054 | Event Note: An optional pre-bid meeting will be held at the project site, located on The Strand, behind the property at 815 S. Pacific Street, Oceanside, CA 92054 at 10:00 AM on Wednesday, April 8, 2026. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next A-Main STANDARD Code Description UOM Qty A1 Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) Lump-Sum 1 A2 Water Pollution Control Lump-Sum 1 A3 Pre-construction Videos and Photographs Lump-Sum 1 A4 Public Notifications Lump-Sum 1 A5 Excavation & Site Preparation Lump-Sum 1 A6 Furnish & Install Permeable Pavers Lump-Sum 1 A7 Furnish & Install Concrete Embankment Lump-Sum 1 A8 Pressure Groud Void Filling Beneath Concrete Pad Lump-Sum 1 | Next A-Main STANDARD Code Description UOM Qty A1 Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) Lump-Sum 1 A2 Water Pollution Control Lump-Sum 1 A3 Pre-construction Videos and Photographs Lump-Sum 1 A4 Public Notifications Lump-Sum 1 A5 Excavation & Site Preparation Lump-Sum 1 A6 Furnish & Install Permeable Pavers Lump-Sum 1 A7 Furnish & Install Concrete Embankment Lump-Sum 1 A8 Pressure Groud Void Filling Beneath Concrete Pad Lump-Sum 1 | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | A2 | Water Pollution Control | Lump-Sum | 1 | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | A4 | Public Notifications | Lump-Sum | 1 | A5 | Excavation & Site Preparation | Lump-Sum | 1 | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 | | | | Next A-Main STANDARD Code Description UOM Qty A1 Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) Lump-Sum 1 A2 Water Pollution Control Lump-Sum 1 A3 Pre-construction Videos and Photographs Lump-Sum 1 A4 Public Notifications Lump-Sum 1 A5 Excavation & Site Preparation Lump-Sum 1 A6 Furnish & Install Permeable Pavers Lump-Sum 1 A7 Furnish & Install Concrete Embankment Lump-Sum 1 A8 Pressure Groud Void Filling Beneath Concrete Pad Lump-Sum 1 | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | A2 | Water Pollution Control | Lump-Sum | 1 | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | A4 | Public Notifications | Lump-Sum | 1 | A5 | Excavation & Site Preparation | Lump-Sum | 1 | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 | | | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | | A2 | Water Pollution Control | Lump-Sum | 1 | | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | | A4 | Public Notifications | Lump-Sum | 1 | | A5 | Excavation & Site Preparation | Lump-Sum | 1 | | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next A-Main STANDARD Code Description UOM Qty A1 Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) Lump-Sum 1 A2 Water Pollution Control Lump-Sum 1 A3 Pre-construction Videos and Photographs Lump-Sum 1 A4 Public Notifications Lump-Sum 1 A5 Excavation & Site Preparation Lump-Sum 1 A6 Furnish & Install Permeable Pavers Lump-Sum 1 A7 Furnish & Install Concrete Embankment Lump-Sum 1 A8 Pressure Groud Void Filling Beneath Concrete Pad Lump-Sum 1 | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | A2 | Water Pollution Control | Lump-Sum | 1 | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | A4 | Public Notifications | Lump-Sum | 1 | A5 | Excavation & Site Preparation | Lump-Sum | 1 | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 | | | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | | A2 | Water Pollution Control | Lump-Sum | 1 | | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | | A4 | Public Notifications | Lump-Sum | 1 | | A5 | Excavation & Site Preparation | Lump-Sum | 1 | | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | A1 | Mobilization and Demobilization (not to exceed 10% of total Schedule A bid cost) | Lump-Sum | 1 | | A2 | Water Pollution Control | Lump-Sum | 1 | | A3 | Pre-construction Videos and Photographs | Lump-Sum | 1 | | A4 | Public Notifications | Lump-Sum | 1 | | A5 | Excavation & Site Preparation | Lump-Sum | 1 | | A6 | Furnish & Install Permeable Pavers | Lump-Sum | 1 | | A7 | Furnish & Install Concrete Embankment | Lump-Sum | 1 | | A8 | Pressure Groud Void Filling Beneath Concrete Pad | Lump-Sum | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.