SLED Opportunity · MICHIGAN · OAKLAND COUNTY
AI Summary
Oakland County WRC seeks bids for a 3-year contract to supply Gardner Denver blower parts for wastewater treatment facilities in Michigan, ensuring critical aeration equipment maintenance and regulatory compliance.
The office of the Oakland County Water Resources Commissioner (WRC) is a countywide elected office currently held by Jim Nash. The office is made up of approximately 370 employees who are responsible for the management of stormwater, drinking water, and wastewater services for residents throughout Oakland County. WRC performs operations and maintenance services for 22 local municipalities and numerous county and inter-county drains also including construction, asset management, environmental regulations, public education, water and sewer rate development, customer billing, and emergency services. The WRC is a regional leader on high-impact regional water service delivery projects. Oakland County Purchasing is requesting bids for a 3-year blanket contract on behalf of the Water Resource Commissioners office for Gardner Denver blower parts as specified below for our Walled Lake/Novi Wastewater Treatment facility and Clinton River Water Resource Recovery Facility, on an as-needed basis. Oakland County Water Resources Commissioner (WRC) operates and maintains the Walled Lake/Novi and Clinton River wastewater treatment facilities. Both facilities rely on Gardner Denver blowers to provide critical aeration for sewage treatment processes. To ensure continuous and reliable operation, the WRC requires the replacement of various lower components and, when necessary, complete blower units on an as-needed basis. These Gardner Denver blowers are essential to maintaining proper treatment performance and regulatory compliance at both facilities. Any failure or interruption in the blower operation could significantly impact system functionality and treatment effectiveness. Facility Locations Walled Lake/Novi Wastewater Treatment Facility – 46351 West Rd, Novi MI 48377 Clinton River Water Resource Recovery Facility – 155 North Opdyke Rd., Pontiac MI 48342 Additional locations may be added during the duration of the contract with approval from both parties. Brand/Model Brand Name Only Manufacturer: Gardner Denver Model: Lamson Series 850 model 858 AD and Hoffman model 75106A Additional models may be added during the duration of the contract. Specs The WRC is seeking the following: Full Catalog Pricing list(s) Contractors must submit their catalog for parts to WRC for 2026, 2027 and 2028. Items not included in the price list may be quoted and ordered separately throughout the duration of the contract. The awarded vendor must be able to provide a quote with shipping included. Provide warranty information for Gardner Denver blower parts Shipping must be included in the price list Discount(s) off Orders: _________% Note: Oakland County WRC is tax exempt and can provide necessary documentation upon bid award. If applicable, please provide pricing with a government discount. All pricing shall be firm and fixed for the initial 3 years. Rates can increase for an optional fourth or fifth year with valid justification. No additional surcharges or tariffs shall be permitted during the duration of the contract. **Solicitation Type**: ITB - Invitation to Bid (Formal) **Source ID**: PU.AG.USA.1328.C10568151 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/01/2026 10:00 AM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Additional Bidding Instructions**: See the attached specs for pricing requirements. **Owner Organization**: Water Resources Commissioner **Solicitation Number**: Oak-0000001162 **Reference Number**: 0000421321 **Pricing**: In attached document **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | Yes | No | **Line Items**: | No | Description | UOM | Qty | |---|---|---|---| | 1 | Full Catalog - Quote percentage off Note: Oakland County WRC is tax exempt and can provide necessary documentation upon bid award. If applicable, please provide pricing with a government discount. Contractors must submit their catalog for parts to WRC for 2026, 2027 and 2028. i. Items not included in the price list may be quoted and ordered separately throughout the duration of the contract. The awarded vendor must be able to provide a quote with shipping included. Upload Catalogs into Bidnet Shipping is FOB Destination Manufacturer Gardner Denver Part # Catalog Brand Preference Brand Name Only | Percent | 1 |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.