    Invitation to bid for the replacement and relocation of the Sarah Fisher Wastewater Pump Station in Farmington Hills, MI, including installation of pumps, wet well, valve vault, generator, electrical controls, gravity sewer, and force main using horizontal directional drilling.

    Opportunity details

    Solicitation No.
    8010403263
    Type / RFx
    ITB
    Status
    Active
    Level
    local
    Published Date
    December 9, 2025
    Due Date
    January 13, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Michigan
    Agency
    Oakland County

    Description

    Replacement of the Sarah Fisher Wastewater Pump Station located 27402 West 12 Mile Road in the City of Farmington Hills. The project consists of relocating the lift station to the south to a location along the north side of 12 Mile Road. The project will involve installing two new submersible pumps, an 8’ diameter wet well, 6’x7’ valve vault, generator, transformer relocation, and new electrical/controls at the pump station. Approximately 600 feet of 10-inch gravity sewer will be installed in a new sewer easement from the existing lift station to the new station located along 12 Mile Road. Also, 2,600 feet of 6-inch force main will be installed primarily through horizontal directional drilling from the new station to the outlet manhole west of Balmoral Way. The force main installation will involve crossing beneath Pebble Creek within a sewer easement adjacent to the road right-of-way. Replacement of the Sarah Fisher Wastewater Pump Station located 27402 West 12 Mile Road in the City of Farmington Hills. The project consists of relocating the lift station to the south to a location along the north side of 12 Mile Road. The project will involve installing two new submersible pumps, an 8’ diameter wet well, 6’x7’ valve vault, generator, transformer relocation, and new electrical/controls at the pump station. Approximately 600 feet of 10-inch gravity sewer will be installed in a new sewer easement from the existing lift station to the new station located along 12 Mile Road. Also, 2,600 feet of 6-inch force main will be installed primarily through horizontal directional drilling from the new station to the outlet manhole west of Balmoral Way. The force main installation will involve crossing beneath Pebble Creek within a sewer easement adjacent to the road right-of-way.

    Key dates

    1. December 9, 2025Published
    2. January 13, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.