Active Solicitation · DEPT OF DEFENSE

    5TH ARMORED BRIGADE (5TH AR BDE) TURF REPLACEMENT FORT BLISS, TEXAS.

    Sol. W911SG26QA049SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)FORT BLISS, TX
    Open · 16d remaining
    DAYS TO CLOSE
    16
    closes Aug 21, 2026
    POSTED
    Aug 5, 2026
    Publication date
    NAICS CODE
    238990
    Primary industry classification
    PSC CODE
    Z2PA
    Product & service classification

    AI Summary

    The 5th Armored Brigade is seeking a contractor to replace the degraded turf at Brigade Headquarters at Fort Bliss, Texas. The project involves installing a high-quality artificial turf solution to enhance safety and support Army readiness. Detailed specifications for the turf area and markings are provided in the attached PWS.

    Contract details

    Solicitation No.
    W911SG26QA049
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 5, 2026
    Response Deadline
    August 21, 2026
    NAICS Code
    238990AI guide
    PSC / Class Code
    Z2PA
    Issuing Office
    W6QM MICC-FT BLISS
    Primary Contact
    Joy Ajah-Job
    State
    TX
    ZIP Code
    79916-6812
    AI Product/Service
    service

    Description

    See attached PWS.

    The 5th AR BDE is seeking to replace the existing training area and worn turf at the Brigade Headquarters. The current facility is severely degraded and presents active safety hazards to Soldiers. This requirement will deliver a permanent, high-quality, and resilient artificial turf solution to eliminate these safety risks and provide a modernized physical training environment that directly supports Army readiness. The entire turf area forms a perfect rectangle with the following outer boundary dimensions: Length 84 ft., Width 102 ft. The 84-foot length of the field is divided into three distinct sections: a Western gap, a central lane area, and an Eastern gap. Starting from the Western edge, there is a 22 ft. (22') open green turf gap before the lane section begins. Adjacent to the Western gap is the main lane area, which spans a total of 50 ft. (50') across. Following the lane section, there is a 12 ft. (12') open green turf gap extending to the Eastern edge of the field. There will be exactly 6 white lines marked across the field. Each of these white lines measures approximately 82.5 feet (82' 6") long, running parallel to the width of the field. The 50-foot central section is divided evenly into 5 numbered lanes. Each of the 5 lanes is exactly 10 feet (10') wide. Each lane contains a number (1 through 5). The numbers are exactly 3 feet 6 inches (3' 6") tall/long and with a width of 1.5 feet. Each number is horizontally centered within its 10-foot-wide lane. The numbers are placed exactly 3 feet (3') away from the designated starting line. The 5th Armored Brigade Logo is positioned directly in the middle of the 5 lanes, perfectly centered within the 50 ft. lane section. It has a length of 15 ft. and a width of 7.5 ft. The primary, thick structural lines of the "A" shape are to be colored a deep Jet Black. The lower half of the "A" symbol must be filled with a Crimson Red; the remaining top half will be painted white. The borders of the symbol will be Hunter Green.

    Key dates

    1. August 5, 2026Posted Date
    2. August 21, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    5TH ARMORED BRIGADE (5TH AR BDE) TURF REPLACEMENT FORT BLISS, TEXAS. is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.