Closed Solicitation · DEPT OF DEFENSE

    AASF FUEL FARM REPAIRS

    Sol. W9124X25QA016Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)CARSON CITY, NV
    Closed
    STATUS
    Closed
    closed Sep 19, 2025
    POSTED
    Sep 5, 2025
    Publication date
    NAICS CODE
    811310
    Primary industry classification
    PSC CODE
    J091
    Product & service classification

    AI Summary

    The Department of Defense is seeking contractors for the repair of a Scully Deadman switch and a filter separator vessel at the AASF fuel farm. This project aims to enhance safety during refueling operations. The estimated period of performance is from September 22, 2025, to October 31, 2025. Interested parties should refer to the attached documents for detailed requirements.

    Contract details

    Solicitation No.
    W9124X25QA016
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 5, 2025
    Response Deadline
    September 19, 2025
    NAICS Code
    811310AI guide
    PSC / Class Code
    J091
    Primary Contact
    Andrew Simbeck
    State
    NV
    ZIP Code
    89701-6807
    AI Product/Service
    service

    Description

    The United States Property and Fiscal Office Purchasing and Contracting Division on behalf of the 991st AVN requires a replacement of the Scully Deadman switch to reliably pull fuel from the underground tanks into the refueling vehicles, and provide a safety stop to the fuel if there is an issue during refueling.  Currently, the switch is intermittent and poses a safety concern as using the fuel farm requires the Deadman to be bypassed, removing that guard. The filter separator vessel is beginning to fail, increasing the potential for dangerous particulates to make it into Aircraft fuel.

    (b) There is no current contract for this requirement.

    (c) Dates with Line Item Numbers (LINs):

                (1) LIN 0001 F-24 - Scully Deadman Switch Repair estimated Period of Performance (PoP) 22 September 2025 - 31 October 2025;

                (2) LIN 0002 F-24 - Filter Separator Vessel Repair Estimated PoP 22 September 2025 – 31 October 2025.

    52.212-2 Evaluation – Commercial Products and Commercial Services (NOV 2021)

    (a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:

                (1) Price

                (2) Technical Requirements

                (3) Past Performance

    Technical requirements and past performance, when combined, are approximately equal to cost or price.

    (b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).

    (c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer’s specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.

    (End of provision)

    See attached "PWS - Fuel Farm Fixes" and "Combined Synopsis Solicitation for Services W9124X25QA016" for a complete description of required services.

    Key dates

    1. September 5, 2025Posted Date
    2. September 19, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    AASF FUEL FARM REPAIRS is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.