Active Solicitation · DEPT OF DEFENSE

    Amendment 0002- Combined synopsis/solicitation for Architect-Engineer (A-E) services

    Sol. W912C326RA007Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)FORT BUCHANAN, PR
    Open · 10d remaining
    DAYS TO CLOSE
    10
    closes May 4, 2026
    POSTED
    Apr 20, 2026
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    C219
    Product & service classification

    AI Summary

    This opportunity is for Architect-Engineer services to conduct a comprehensive assessment of a clinic facility in Puerto Rico. The contractor will perform a structural assessment and may optionally assess the HVAC system. A firm-fixed-price contract will be awarded based on the proposals received.

    Contract details

    Solicitation No.
    W912C326RA007
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 20, 2026
    Response Deadline
    May 4, 2026
    NAICS Code
    541330AI guide
    PSC / Class Code
    C219
    Contract Code
    2100
    Primary Contact
    AHEISHA CROOKS
    State
    PR
    ZIP Code
    00934-4572
    AI Product/Service
    service

    Description

    This is a combined synopsis/solicitation for Architect-Engineer (A-E) services prepared in accordance with Federal Acquisition Regulation (FAR) Part 36.2, Brooks Act. The Government intends to award a firm-fixed-price contract for the services described herein.1. PROJECT DESCRIPTIONThe Contractor shall provide all necessary professional engineering services to conduct a comprehensive assessment of a single-story, approximately 12,000 square foot clinic facility located in Puerto Rico. The work consists of a Base requirement and one (1) Optional requirement.? Base Requirement: A complete non-invasive structural assessment to evaluate the building?s structural integrity, identify deficiencies, and provide a report with a prioritized list of recommended repairs and an estimated magnitude of cost.? Optional Requirement: A complete mechanical (HVAC) assessment to evaluate the condition and performance of the HVAC system and its components. This includes performing an engineering analysis based on ACCA Manuals N, S, and D to determine if the equipment and ductwork are correctly sized and configured for the facility. If exercised, this option will require a separate report with prioritized recommendations and cost estimates.The Government may exercise the Option at its sole discretion after a review of the Structural Assessment Report. A detailed Statement of Work is provided in the attachments.

    Key dates

    1. April 20, 2026Posted Date
    2. May 4, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Amendment 0002- Combined synopsis/solicitation for Architect-Engineer (A-E) services is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.