Closed Solicitation · DEPT OF DEFENSE

    Architectural & Engineering Services in Support of Microgrid and Backup Power Design, Camp Walker, Republic of Korea (ROK)

    Sol. W912DY25FA226-1Sources SoughtREDSTONE ARSENAL, AL
    Closed
    STATUS
    Closed
    closed Dec 12, 2025
    POSTED
    Dec 4, 2025
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    C219
    Product & service classification

    AI Summary

    The U.S. Army Corps of Engineers is seeking responses from qualified Korean Architect-Engineer firms for a Sources Sought notice regarding architectural and engineering services for microgrid and backup power design at Camp Walker, ROK. Interested firms must demonstrate relevant experience and qualifications by the submission deadline of December 12, 2025.

    Contract details

    Solicitation No.
    W912DY25FA226-1
    Notice Type
    Sources Sought
    Posted Date
    December 4, 2025
    Response Deadline
    December 12, 2025
    NAICS Code
    541330AI guide
    PSC / Class Code
    C219
    Contract Code
    2100
    Primary Contact
    Antonio L. Mastin
    State
    AL
    ZIP Code
    35898-0000
    AI Product/Service
    service

    Description

    This is a SOURCES SOUGHT NOTICE that is issued solely for informational and planning purposes and does not constitute a solicitation. This notice is for market research purposes only and IS NOT A REQUEST FOR PROPOSAL, nor does it restrict the Government as to the ultimate acquisition approach. This notice is open for responses from Korean Architect-Engineer (A-E) Firms Only and responses will be utilized to determine if this requirement can be set-aside for Korean A-E Firms. The Government will not reimburse respondents for any cost incurred in preparation of a response to this notice. Responses to this notice are not offers and cannot be accepted by the Government to form a binding contract. The Government does not intend to rank submittals or provide any reply to interested companies and responses will not be returned. 1. CONTRACT INFORMATION: The U.S. Army Corps of Engineers, Huntsville Engineering and Support Center (CEHNC) in Huntsville, Alabama, is conducting market research to identify qualified Korean A-E Firms capable of providing a range of services as part of the Energy Resilience & Conservation Investment Program (ERCIP), to include but not limited to the following: Facility assessment, design development, cost estimation, cost and risk assessment, utility coordination, other associated studies or project support. These services will support all facilities on Camp Walker, ROK. The Government is performing market research to determine if any Korean A-E Firms possess the capability to execute the requirements within this acquisition. Interested Korean A-E Firms who meet the capability requirements identified in this notice are requested to reply to this notice with a response to the questions below. If no experience or capabilities are associated with a particular question, please specify. All Korean A-E Firms must be registered in the System for Award Management (SAM). 2. PROJECT INFORMATION: Contractors (KTRs) must have the capability to develop a 100% Design Bid Build package, to include the development of cost estimates and design and construction schedules, of a smart microgrid system to provide energy resilience for all facilities on Camp Walker, ROK, in support of DoD and other Government agencies and activities. All products must be in English. The project will include 1,650KWdc rooftop and carport Photovoltaic (PV) solar arrays, 4,000KW diesel generator capacity, a 6,000KW/3,000KWh Battery Energy Storage System (BESS), microgrid controls, transformers, and switches. The project includes new carports, and structural upgrades and replacement of building roof systems to support the PV solar arrays. The project will integrate 2.5MW of existing diesel generator capacity into the microgrid. Also included in the project is commissioning and testing, cybersecurity, electric service, site improvements, information systems, and environmental air permitting. KTRs will coordinate interconnection agreements with Korea Electric Power Corporation. KTRs should have familiarity with Unified Facilities Criteria (UFC) and Unified Facility Guide Specifications (UFGS). 3. SUBMISSION REQUIREMENTS: Interested firms should submit a document which furnishes information describing relevant demonstrated experience and qualifications in the following format: The submissions should be Times New Roman, font size 12 and should not exceed 10, one-sided, 8 ½" X 11" pages. The submission will address all questions in the Capabilities Questionnaire listed below and your ability to perform the services stated in the above notice. Submit responses via email to: Antonio Mastin, antonio.l.mastin@usace.army.mil and Cole Harris, cole.p.harris@usace.army.mil. Submissions shall be received NO LATER THAN 2:00 P.M. Central Time on 12 December 2025 (or sooner). NO HARDCOPY OR FACSIMILE SUBMISSIONS WILL BE ACCEPTED. Cover letters and extraneous materials (brochures, etc.) will not be considered. Personal visits for the purpose of discussing this announcement will not be scheduled. 4. CAPABILITIES QUESTIONNAIRE SECTION I: GENERAL a. Business Name: (Insert Business Name) b. Business Address: (Insert Business Address) c. Cage Code/UEI: d. Responsible Point of Contact: (Insert name, address, phone number, and email address)

    Key dates

    1. December 4, 2025Posted Date
    2. December 12, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Architectural & Engineering Services in Support of Microgrid and Backup Power Design, Camp Walker, Republic of Korea (ROK) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.