Closed Solicitation · DEPARTMENT OF JUSTICE

    BACKFLOW, VALVES AND CHILLER REPLACEMENTS

    Sol. 15A00025Q00000111SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)WASHINGTON, DC
    Closed
    STATUS
    Closed
    closed Sep 16, 2025
    POSTED
    Sep 16, 2025
    Publication date
    NAICS CODE
    238220
    Primary industry classification
    PSC CODE
    Z1AA
    Product & service classification

    AI Summary

    The Department of Justice is seeking a contractor to provide mechanical services, including the installation of backflow preventers, main gate valves, and chiller pipe replacements. The work must be completed during off hours, and all necessary equipment and materials must be supplied by the contractor.

    Contract details

    Solicitation No.
    15A00025Q00000111
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    September 16, 2025
    Response Deadline
    September 16, 2025
    NAICS Code
    238220AI guide
    PSC / Class Code
    Z1AA
    Issuing Office
    ATF
    Primary Contact
    Brandon Hodnett
    State
    DC
    ZIP Code
    20226
    AI Product/Service
    service

    Description

    The Contractor shall furnish all equipment, materials, and labor required to perform the following 3 mechanical services:

    1. Backflow Preventors
      • Supply and install 2 each 8” Zurn/Wilkins or equivalent BFP
      • Supply and install 1 each 4” Zurn/Wilkins or equivalent BFP
      • Supply and install 1 each 1.5” Zurn/Wilkins or equivalent BFP
    2. Main Gate Valves
      • Supply and install two 8" valves on the effluent side of the backflow preventers. Replace two 8" flanged ductile 90's, one 8" tee, and the seven bolt & gasket kits.
      • NOTE-This work will need to be completed during off hours.
    3. Chiller Pipe Replacement
      • Replace the IO-inch schedule 40-weld pipe (up to 8 feet) that is leaking in the ceiling of the chiller room.
      • Remove the section of IO-inch schedule 40 weld pipe (up to 8 feet) Tis will require disconnecting the chemical feed line.
      • Install 2 new thread-o-lets, plug one off and connect the new chemical line.
      • Replace the schedule 80 PVC all the way back to the ball valve with new split rings.
      • Leak checked to be performed and monitored by building engineers for 24 hours before insulating
      • Install new insulation and wrapping over new pipe and tie into existing.
      • The plastic vinyl 90's may be reused if not damaged during removal
      • The contractor shall provide and use a smoke eater during all welding, grinding, cutting, and torching of the pipe.
      • Provide necessary fire safety equipment and inform building engineers when fire or sparks will be taking place.

    Key dates

    1. September 16, 2025Posted Date
    2. September 16, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    BACKFLOW, VALVES AND CHILLER REPLACEMENTS is a federal acquisition solicitation issued by DEPARTMENT OF JUSTICE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.