Active Solicitation · DEPARTMENT OF STATE

    BASKETBALL COURT RECONSTRUCTION

    DEPARTMENT OF STATE
    Sol. 19AU9026Q0010SolicitationWASHINGTON, DC
    Open · 15d remaining
    DAYS TO CLOSE
    15
    closes Jul 29, 2026
    POSTED
    Jun 29, 2026
    Publication date
    NAICS CODE
    238990
    Primary industry classification
    PSC CODE
    Z1FC
    Product & service classification

    AI Summary

    This solicitation is for the reconstruction of a basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria. The project includes demolition, soil removal, and construction of a new court with drainage, rubber surface, lighting, and safety measures, all while maintaining facility operations.

    Contract details

    Solicitation No.
    19AU9026Q0010
    Notice Type
    Solicitation
    Posted Date
    June 29, 2026
    Response Deadline
    July 29, 2026
    NAICS Code
    238990AI guide
    PSC / Class Code
    Z1FC
    Issuing Office
    U.S. EMBASSY VIENNA
    Primary Contact
    Zahid Raja
    State
    DC
    ZIP Code
    20520
    AI Product/Service
    service

    Description

    This solicitation is for reconstruction of the basketball half-court at the U.S. Tri-Mission Marine House in Vienna, Austria.

    The work includes but is not limited to the following tasks – all as specified in the attached Statement of Work:

    Demolition

    • Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts 
    • Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth = ~55m³

    RConstruction of a new sport field

    • Preparation/installation subgrade/subbase incl. drainage
    • Installation top layer (EPDM rubber surface or equal)
    • Installation point foundation for 1 basketball hoop and for 2 light poles
    • Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabling/rewiring
    • Laying stone slabs 40x40x5cm around the court
    • Painting lines
    • Final cleaning

    Special requirements:

    • The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work
    • USG Security regulations
    • Clearance process for employees, cars, material on site
    • Safety and protective measures

    Key dates

    1. June 29, 2026Posted Date
    2. July 29, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    BASKETBALL COURT RECONSTRUCTION is a federal acquisition solicitation issued by DEPARTMENT OF STATE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.