Active Solicitation · DEPARTMENT OF STATE

    Basketball court reconstruction

    DEPARTMENT OF STATE
    Sol. 19AU9026Q0010PresolicitationWASHINGTON, DC
    Open · 36d remaining
    DAYS TO CLOSE
    36
    closes Jul 29, 2026
    POSTED
    Jun 11, 2026
    Publication date
    NAICS CODE
    238990
    Primary industry classification
    PSC CODE
    Z1FC
    Product & service classification

    AI Summary

    The Department of State is seeking a general contractor for the reconstruction of a basketball half-court at the U.S. Embassy in Vienna. The project includes demolition of the existing court, installation of a new surface, lighting, and necessary site preparation. The work must be completed within a 5-week period in fall 2026, while ensuring minimal disruption to residents.

    Contract details

    Solicitation No.
    19AU9026Q0010
    Notice Type
    Presolicitation
    Posted Date
    June 11, 2026
    Response Deadline
    July 29, 2026
    NAICS Code
    238990AI guide
    PSC / Class Code
    Z1FC
    Contract Code
    1900
    Issuing Office
    U.S. EMBASSY VIENNA
    Primary Contact
    Zahid Raja
    State
    DC
    ZIP Code
    20520
    AI Product/Service
    service

    Description

    This project if for the reconstruction of the basketball half-court at the U.S. Embassy Vienna Marine House, located in 1190 Vienna. The existing outdoor basketball half-court is at the end of its life cycle and too small in dimensions. The scope of work includes but is not limited to the demolition of the existing sports field surface and substructure, in their entirety, as well as the removal of the lighting. Construction of a new sports field surface, including the substructure, in its entirety, as well as a new lighting system. Scope of work: General Contractor for Construction of Sport Fields and Electrical Installation - Site Installation - Demolition Demolition, removal and disposal of existing basketball half- court (asphalt layer 7x8m), existing exterior lights and basketball basket with posts Soil removal and disposal for new basketball half- court dimension (13mx14m = 182m²), 0.3m depth = ~55m³ - Construction of a new sport field Preparation/installation subgrade/subbase incl. drainage Installation top layer (EPDM rubber surface or equal) Installation point foundation for 1 basketball hoop and for 2 light poles Installation 1 adjustable basketball hoop, and 2 exterior lights incl. cabling/rewiring Laying stone slabs 40x40x5cm around the court Painting lines Final cleaning - Special requirements The work will be carried out while the facility remains in operation and in the presence of the residents, who should not be disturbed during the construction work USG Security regulations Clearance process for employees, cars, material on site Safety and protective measures Execution periods Indicative construction schedule: 5 weeks in fall 2026

    Key dates

    1. June 11, 2026Posted Date
    2. July 29, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Basketball court reconstruction is a federal acquisition solicitation issued by DEPARTMENT OF STATE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.