Closed Solicitation · DEPARTMENT OF AGRICULTURE
AI Summary
The Beaverhead-Deerlodge NF requires contractors for the reconstruction of disaster relief fencing. The project involves removing and constructing a 4-wire fence, including associated braces and gates. The work is expected to commence on October 1, 2025, and be completed by September 30, 2026, with a project magnitude between $25,000 and $100,000.
C.1 SCOPE OF CONTRACT The intent of the contract is to provide for the construction of the work described. The precise details of performing the work are not stipulated except as considered essential for the successful completion of the work. Furnish all labor, equipment, tools, transportation, and supplies necessary to complete the work according to the contract. Fence materials will be provided by Forest Service. The work would consist of the removal and construction of 4-wire fence with associated braces and gates. Removal of all T-posts, fence wire and line braces, corner braces and line posts to clear the fence line for new construction. Work covered under each Pay Item in the Schedule of Items includes: Pay Item No. 1 Mobilization: The work shall consist of moving personnel, equipment, material, and incidentals to the project and performing all work necessary before beginning work at the project site. Pay Item No. 1 Remove wire posts and stays: The work shall consist of the removal of a 4- with steel and wood posts from Forest Service lands Pay Item No. 2 Replace wire posts and stays: The work shall consist of the construction of a 4-wire (three barbed wire (top three) and one smooth wire (bottom wire) fence with steel posts. See Specifications for installation specs. Pay Item No. 3 Remove and replace single brace: The work shall consist of the removal and construction of single braces. See Specifications for installation specs. Pay Item No. 4 Remove and replace double brace: The work shall consist of the removal and construction of double braces. See Specifications for installation specs. Pay Item No. 5 Installation of 14ft swing Gate: The work shall consist of the installation of a 14-foot swing gate. Pay Item No. 6 Removal and replacement of 12ft wire gate: The work shall consist of the Removal and replacement of 12ft wire gate. Pay Item No. 7 Removal and replacement of post and rail fence: The work shall consist of the installation of a 12-foot wire gate. C.2 PROJECT LOCATION Horse Prairie Cabin 420 Barrett St, Dillon MT 59725 C.3 MAGNITUDE OF CONSTRUCTION PROJECT Between $25,000 and $100,000. C.4 SITE VISIT Per FAR Part 52.236-3 Site Investigation and Conditions Affecting the Work, contractor is encouraged and expected to visit the site. No official Site Visit shall be performed. Ensure you are familiar with inclement weather as this may hinder access to certain roads. C.5 PERIOD OF PERFORMANCE Work on the site shall commence no earlier than October 01, 2025, and proceed in accordance with the contractors approved work schedule and run continuously till the end of the project no later than September 30th, 2026.
Beaverhead-Deerlodge NF Hollow Disaster Relief Fence Reconstruction is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.