Active Solicitation · DEPT OF DEFENSE
AI Summary
The Buckley Space Force Base is conducting market research to identify qualified contractors for cooling infrastructure repair parts, including elbow and pipe repair packages, pipe freezing kits, and carbon fiber composite reinforcement packages. Responses are requested regarding delivery times, certifications, and warranty options. This is a sources sought notice and not a solicitation.
This sources sought is issued for the purpose of market research only. In accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes.
Please review the two attachments for the complete requirement that is being asked.
The Buckley Space Force Base (BSFB) 460th Contracting Squadron is requesting information from vendors to determine the availability of qualified contractors to provide the following material packages:
- ITEM 0001: Elbow and Pipe Repair Package
- ITEM 0002: Pipe Freezing Kit
- ITEM 0003: Carbon Fiber Composite Reinforcement Package.
The Government is requesting a response to the following:
1. What is the fastest delivery time after award you could provide each of these items? (Please reply citing the delivery time to Buckley Space Force Base, Colorado, noting the required delivery of no later than 14 days after receipt of order.)
2. Is there a different NAICS code that would better fit the item(s)?
3. What certifications (if any) are required by the end user to use or install this brand of equipment?
4. Do you have a pre-priced contract vehicle with these items on your schedule? If so, please provide the contract/schedule number for validation.
5. Is a warranty included? If so, what is the standard commercial warranty? What are your extended warranty options?
6. Company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable.
7. Confirmation that you are an authorized re-seller of the items and provided on your GSA schedule (not open market).
8. Is this requirement clear? Do any aspects need further clarification?
9. Can you provide a Rough Order of Magnitude (ROM)?
10. Is 14 days after receipt of award enough time to complete the work and all deliverables?
BUCKLEY SFB COOLING INFRASTRUCTURE REPAIR PARTS is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.