Closed Solicitation · DEPT OF DEFENSE

    Buckley SFB Rectifier Inverter System Replacement

    Sol. FA2543RectifierSources SoughtSet-aside: Total Small Business Set-Aside (FAR 19.5)BUCKLEY AFB, CO
    Closed
    STATUS
    Closed
    closed Apr 2, 2026
    POSTED
    Mar 25, 2026
    Publication date
    NAICS CODE
    335999
    Primary industry classification
    PSC CODE
    6130
    Product & service classification

    AI Summary

    The Department of Defense is seeking market research responses for the replacement of a rectifier/inverter system at Buckley SFB. Interested vendors should provide company information, technical capabilities, past performance, and a Rough Order of Magnitude price estimate. Responses are due by the specified deadline and should include contact details for follow-up.

    Contract details

    Solicitation No.
    FA2543Rectifier
    Notice Type
    Sources Sought
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    March 25, 2026
    Response Deadline
    April 2, 2026
    NAICS Code
    335999AI guide
    PSC / Class Code
    6130
    Contract Code
    5700
    Issuing Office
    FA2543 460 CONS
    Primary Contact
    Maurice Epps
    State
    CO
    ZIP Code
    80011-9572
    AI Product/Service
    both

    Description

    The purpose of this Sources Sought is for market research purposes only to obtain a list of capable vendors and possible industry feedback. Please see attached Statement of Need for all requirements. Please include BOTH 2d Lt Maurice Epps email: maurice.epps@spaceforce.mil or TSgt Matthew Kennedy email: matthew.kennedy.24@us.af.mil on all communications. Please see below questions and include answers to them with your response to this Sources Sought. COMPANY INFORMATION: What is your company's name, address, CAGE code, and Unique Entity ID (UEI)? Who is the best person to contact for follow-up questions? Please provide their name, title, email, and phone number. What is your company's business size (e.g., small business, large business)? Do you fall under any socioeconomic categories (e.g., 8(a), HUBZone, Service-Disabled Veteran-Owned Small Business)? STATEMENT OF NEED/REQUIREMENTS: Are there any specifications, terms, or requirements that are unclear, ambiguous, or could be misinterpreted? If so, please specify the section and your question. Based on your experience with similar projects, are there any critical components, processes, or requirements missing from the SON that are essential for a successful and fully functional system replacement? Do you have any recommendations for improving this Statement of Need to allow for a more accurate and competitive response? TECHNICAL CAPABILITY: Does your company possess the necessary technical expertise, equipment, and resources to perform the full replacement of the rectifier/inverter system, including battery strings, battery disconnects, and A/C power circuits, as described in the Statement of Need? Please briefly describe your core competencies relevant to this project. Briefly describe your general approach to designing and integrating a power rectification and distribution system that meets or exceeds the specified amp load (2,800 amps) and accommodates existing DC breaker panels and A/C circuits. Describe your general methodology for installing such a complex system, particularly regarding minimizing disruption to critical operations and ensuring seamless integration with existing infrastructure. PAST PERFORMANCE/EXPERIENCE: Do you have any examples of similar projects completed within the past 5 years? Have you performed similar work for the Department of Defense or other federal agencies? If so, please describe your experience. DELIVERY/INSTALLATION: What is the estimated lead time for equipment delivery after contract award? Provide an estimated timeline for the installation process, from site arrival to system commissioning. PRICE ESTIMATE: Please provide a Rough Order of Magnitude (ROM) price for the complete solution, including equipment and installation.

    Key dates

    1. March 25, 2026Posted Date
    2. April 2, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Buckley SFB Rectifier Inverter System Replacement is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.