Closed Solicitation · DEPT OF DEFENSE

    BUCKLEY SFB - REPLACE BOILER VENT PIPING

    Sol. FA2543BoilerExhaustVentReplacementSources SoughtSet-aside: Total Small Business Set-Aside (FAR 19.5)BUCKLEY AFB, CO
    Closed
    STATUS
    Closed
    closed Apr 9, 2026
    POSTED
    Apr 2, 2026
    Publication date
    NAICS CODE
    238220
    Primary industry classification
    PSC CODE
    J045
    Product & service classification

    AI Summary

    This sources sought notice is for market research regarding the replacement of boiler vent piping at Buckley Space Force Base. The contractor will provide all necessary materials and labor to ensure safe operation of the facility. Interested parties should respond with their capabilities and any relevant questions.

    Contract details

    Solicitation No.
    FA2543BoilerExhaustVentReplacement
    Notice Type
    Sources Sought
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 2, 2026
    Response Deadline
    April 9, 2026
    NAICS Code
    238220AI guide
    PSC / Class Code
    J045
    Issuing Office
    FA2543 460 CONS
    Primary Contact
    Cody Wolff
    State
    CO
    ZIP Code
    80011-9572
    AI Product/Service
    service

    Description

    This sources sought is issued for the purpose of market research in accordance with RFO Part 10. The result of this market research will contribute to determining the method of procurement. This announcement is not to be construed as a commitment by the Government, implied or otherwise, to issue a solicitation or to award a contract. At this time, BSFB is not seeking quotes and will not accept unsolicited quotes.

    Please see the two attachments that provides more information on this requirement.

    Primary Objective: The Contractor shall provide all supplies, materials, tools, equipment, and qualified labor necessary for replacing all boiler venting (exhaust & inlet) at Bldg. 205. The existing boiler venting is deteriorating due to ongoing condensate leaks creating a risk of failure that could release hazardous flue gases into the facility. Replacing boiler venting will ensure proper system operation and the continued safety of the facility and its occupants.

    Questions below for discussion:

    1. What is the expected timeframe to complete the work tasks laid out? (Please reply citing the delivery time to Buckley Space Force Base, Colorado.)
    2. Is there a different NAICS code that would better fit the scope of work?
    3. Do you warranty your work? If so, what is the standard warranty? Are there any warranties for the resources used?
    4. Please provide company name, address, point of contact, telephone number, e-mail address, CAGE/DUNS and pre-priced contract vehicle number if applicable.
    5. Is 60 days after date of award enough time to complete the work and all deliverables?
    6. Is a site visit needed for this requirement?
    7. Is this requirement clear? Do any aspects need further clarification?

    Key dates

    1. April 2, 2026Posted Date
    2. April 9, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    BUCKLEY SFB - REPLACE BOILER VENT PIPING is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.