Active Solicitation · DEPARTMENT OF HEALTH AND HUMAN SERVICES

    CHILLER REPLACEMENT ROYBAL CAMPUS

    Sol. 75D301-26-R-73398PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)ATLANTA, GA
    Open · 15d remaining
    DAYS TO CLOSE
    15
    closes May 8, 2026
    POSTED
    Apr 23, 2026
    Publication date
    NAICS CODE
    238220
    Primary industry classification
    PSC CODE
    Z2AA
    Product & service classification

    AI Summary

    The CDC is seeking design-build services for the modernization of the chilled-water plant at the Roybal Campus. This includes replacing chillers, cooling towers, and pumps, along with necessary electrical upgrades and structural modifications. The project aims to maintain campus operations during execution and ensure a fully commissioned facility.

    Contract details

    Solicitation No.
    75D301-26-R-73398
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    April 23, 2026
    Response Deadline
    May 8, 2026
    NAICS Code
    238220AI guide
    PSC / Class Code
    Z2AA
    Primary Contact
    Simi Khera
    State
    GA
    ZIP Code
    30333
    AI Product/Service
    both

    Description

    This acquisition supports modernization of Building 10 (central plant) at the CDC Roybal Campus in Atlanta, Georgia. The objective is to provide complete design-build services to replace aging chilled-water plant equipment, improve electrical and controls infrastructure, maintain continuity of campus operations during phased execution, and deliver a fully commissioned and documented facility.

    a. Provide all design, engineering, management, supervision, labor, materials, equipment, testing, commissioning, training, and closeout services required to modernize the B10 chilled-water plant.

    b. Replace four existing 1,450-ton chillers with new 1,800-ton chillers and provide associated starters, controls, piping, isolation valves, refrigerant monitoring, and appurtenances.

    c. Replace nine existing cooling tower cells with eight new cells; provide structural modifications, walkways, maintenance access, valves, piping, and roofing work required for the new configuration.

    d. Replace primary chilled-water pumps, condenser-water pumps, associated starters / VFDs, and modify chilled-water and condenser-water piping as required for the new plant arrangement.

    e. Perform associated medium-voltage and low-voltage electrical upgrades, BAS / controls integration, structural work, fire protection modifications, and ancillary systems work identified in Attachment A.

    f. Provide phased execution that preserves campus operations; no more than two chillers may be removed from service at one time.

    Key dates

    1. April 23, 2026Posted Date
    2. May 8, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    CHILLER REPLACEMENT ROYBAL CAMPUS is a federal acquisition solicitation issued by DEPARTMENT OF HEALTH AND HUMAN SERVICES. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.