Closed Solicitation

    COMBINED PROJECT-BILLINGS CELLBLOCK REFRESH, BOZEMAN WALL ADDITION, BOZEMAN FREEZER HVAC

    Federal procurement opportunity
    Sol. EQPMBE260022PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)
    Closed
    STATUS
    Closed
    closed Apr 1, 2026
    POSTED
    Mar 18, 2026
    Publication date
    NAICS CODE
    236220
    Primary industry classification
    PSC CODE
    Z2AA
    Product & service classification

    AI Summary

    The General Services Administration (GSA) is seeking qualified contractors for three projects in Montana, including stainless steel restoration, office construction, and HVAC installation for ultra-low temperature freezers. Contractors must provide all labor, materials, and comply with safety standards. A detailed cost breakdown and proposed solutions are required.

    Contract details

    Solicitation No.
    EQPMBE260022
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    March 18, 2026
    Response Deadline
    April 1, 2026
    NAICS Code
    236220AI guide
    PSC / Class Code
    Z2AA
    Primary Contact
    John Morelion
    AI Product/Service
    both

    Description

    The General Services Administration (GSA) is seeking qualified contractors to perform three distinct projects at federal facilities in Montana. Work includes restoration, office construction, and HVAC installation.

    1. Billings USMS - Cellblock Refresh

    • Stainless Steel Restoration:
      • Remove scratches from stainless steel benches and walls in:
      • Contractor/USMS/GSA walk-through required to verify exact damage locations
    • Painting

    2. Bozeman FSA - Office Build-Out

    • Build new wall with metal studs
    • Install door and frame to match existing (type, size, color)
    • Extend wall to deck above
    • Install matching baseboard on new wall
    • Add electrical receptacles if required by code
    • Repair/replace carpet as needed
    • Paint entire room with low VOC paint to match existing
    • Repair affected ceiling grid
    • Relocate fire sprinklers per code
    • Move HVAC ceiling penetrations as needed

    3. Bozeman FWS - Freezer HVAC

    • Install heat removal system for ultra-low temperature freezers
    • Maintain room temperature between 64.4°F to 89.6°F per equipment specifications
    • Solution Options:
      • New exhaust system with fresh air supply duct, OR
      • Ductless split-system AC unit with fresh air supply
      • Contractor to investigate and propose solution with pricing

    GENERAL REQUIREMENTS

    • Provide all labor, materials, equipment, and supervision
    • Comply with all applicable codes and standards
    • Submit detailed cost breakdown and proposed solutions
    • Maintain OSHA and GSA safety standards
    • Coordinate access during business hours
    • HSPD-12 badge required

    Key dates

    1. March 18, 2026Posted Date
    2. April 1, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    COMBINED PROJECT-BILLINGS CELLBLOCK REFRESH, BOZEMAN WALL ADDITION, BOZEMAN FREEZER HVAC is a federal acquisition solicitation. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.