Active Solicitation
AI Summary
The Piegan LPOE requires water mitigation under the main port building through the installation of a French drain system, sump pumps, and a new vapor barrier. This project is a combined synopsis/solicitation and is set aside for SBA. Bidders should be prepared to manage water accumulation effectively.
The Piegan LPOE Port has water accumulation under the main port building that needs to be mitigated. This will be accomplished by the installation of French drain system around the perimeter of the building foundation footings. French drains once installed will empty into contractor supplied sump pumps to collect water to be pumped out into the storm drain system. A new vapor barrier will be installed to damper any ground source water evaporation from occurring under the building.
CRAWLSPACE WATER MITIGATION - PIEGAN LPOE-BABB is a federal acquisition solicitation. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.