Closed Solicitation · DEPT OF DEFENSE

    Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP)

    Sol. W911S226RA003Sources SoughtFORT DRUM, NY
    Closed
    STATUS
    Closed
    closed Aug 14, 2025
    POSTED
    Jul 30, 2025
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    C1EA
    Product & service classification

    AI Summary

    The Department of Defense seeks Architect-Engineering design services for a new Lacquer Preparation Facility at Holston Army Ammunition Plant. This facility will enhance production capacity for RDX and HMX based explosives, ensuring compliance with modern safety and environmental standards. Interested parties should respond to this Sources Sought notice.

    Contract details

    Solicitation No.
    W911S226RA003
    Notice Type
    Sources Sought
    Posted Date
    July 30, 2025
    Response Deadline
    August 14, 2025
    NAICS Code
    541330AI guide
    PSC / Class Code
    C1EA
    Contract Code
    2100
    Issuing Office
    W6QM MICC-FT DRUM
    Primary Contact
    Alfredo Sanchez
    State
    NY
    ZIP Code
    13602-5220
    AI Product/Service
    service

    Description

    The existing Lacquer Preparation Facility at Holston Army Ammunition Plant, Kingsport, TN, comprising ofBuildings 149/150 and a chemical/solvent storage tank farm, is the only facility capable of producing lacquer batches forthe production of all plastic bonded explosives (PBX). The facility receives, stores, handles, and processes the bindermaterials and solvents in manufacturing the lacquer in explosives production. Mobile wagons are used to transfer lacquerfrom the facility to the explosives production buildings. Lacquer is a mixture of dissolved rubbery polymer materials in asolvent that is used as a binding agent in reducing the sensitivity of RDX, HMX, and TATB based explosives formulations.A plasticizer instead of lacquer may also be prepared in the facility to be used as a feedstock raw material in formulatingRDX based explosives. The Lacquer Facility supports legacy explosives and the new Insensitive Munitions (IM) explosivesbeing developed at HSAAP.This effort will require Architect-Engineering (A-E) design services for a new Lacquer PreparationFacility with all the necessary process equipment to support annual production capacity expansion with a minimum of 15Mlbs of RDX and 2.5M lbs of HMX based formulations. This will ensure continuity of operations in maintaining the productioncapability, quality, safety, and environmental requirements to meet modern standards and permits. This new facility willsupport the expansion modernization of HSAAP RDX, HMX, and IMX production capacity to provide a viable capability tomeet current/future DoD explosives production.

    Key dates

    1. July 30, 2025Posted Date
    2. August 14, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Design New Lacquer Preparation Facility for RDX and HMX Production at Holston Army Ammunition Plant (HSAAP) is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.