Closed Solicitation · NATIONAL AERONAUTICS AND SPACE ADMINISTRATION
AI Summary
NASA is seeking an architectural and engineering firm to design modifications for the Vehicle Assembly Building High Bay 3 for the Space Launch System Phase 3. The project involves designing platforms and evaluating integrated models for existing structures, crucial for the Artemis IV launch. Merrick is identified as the only firm with the necessary expertise for this specialized work.
The requirement for the study of the modification to the VAB for SLS Block 1B Crew, Phase 3 at KSC, NASA. Requires an A&E firm with the specialized expertise to design the platforms to be installed, a key component of the overall construction work. Additionally, involved in the evaluation of integrated models for the existing level B2 and C platforms, which are part of ongoing work to be designed and constructed for the Artemis IV launch. Merrick is the only A&E firm with the expertise to provide engineering services during construction of these new platforms and insert structures.
Design of modifying the Vehicle Assembly Building (VAB) High Bay 3 (HB-3) for the Space Launch System (SLS) Phase 3, PCN 99500.4 is a federal contract award from NATIONAL AERONAUTICS AND SPACE ADMINISTRATION. Review the award details including the awardee, contract value, and NAICS code.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.