Closed Solicitation · DEPARTMENT OF VETERANS AFFAIRS

    F115--SOURCES SOUGHT NOTICE SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) 5-YEAR REVIEW MARION, IL VA MEDICAL CENTER

    DEPARTMENT OF VETERANS AFFAIRS
    Sol. 36C25526Q0066Sources SoughtSet-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)LEAVENWORTH, KS
    Closed
    STATUS
    Closed
    closed Nov 7, 2025
    POSTED
    Nov 3, 2025
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    F115
    Product & service classification

    AI Summary

    The Marion, IL VA Medical Center is seeking a contractor for a 5-year review and amendment of its Spill Prevention, Control, and Countermeasures Plan (SPCCP). The contractor must ensure compliance with 40 CFR 112 and update the emergency response plan. The revised document should be user-friendly and certified by an Illinois registered Professional Engineer experienced in SPCCP preparation.

    Contract details

    Solicitation No.
    36C25526Q0066
    Notice Type
    Sources Sought
    Set-Aside
    Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
    Posted Date
    November 3, 2025
    Response Deadline
    November 7, 2025
    NAICS Code
    541330AI guide
    PSC / Class Code
    F115
    Primary Contact
    Greg McMillan Sr.
    State
    KS
    ZIP Code
    66048
    AI Product/Service
    service

    Description

    Revise Spill Prevention, Control, and Countermeasures Plan (SPCCP) For Marion, IL VA Medical Center (MRN) INTRODUCTION MRN VAMC is seeking a 5-year review and amendment of the current plan to verify compliance with current and any new requirements listed in (a-d) below and to update since the approval of the current SPCCP dated/signed March 30, 2021. The revised document shall be electronic and user-friendly. The contractor shall perform a 5-year review according to 40 CFR 112, to include any revisions, updates, or technical changes for amendment. The contractor will make necessary changes including plan content, maps, worksheets, charts, cross references, etc. The contractor may use current plans as references for technical information. SPECIFIC PROJECT REQUIREMENTS The contractor shall: amend, update, and prepare the existing SPCCP, which must be fully compliant with the latest requirements of 40 CFR 112 as well as applicable State and Local regulations. An update of the emergency response plan should be included for accidental releases of vehicular and equipment petroleum products, coolants, and lubricants within the SPCCP. This will include coordination with and cross-referencing the medical center s current Emergency Operations Plan and Integrated Contingency Plan. The plan shall be certified by an Illinois registered Professional Engineer (P.E.) experienced in SPCCP preparation and current industry standards for oil storage and spill prevention. 40CFR 112.7, Oil Pollution Prevention. Amend technical changes from design, construction, operation, and/or maintenance. National Fire Protection Association sections NFPA 30, Flammable and Combustible Liquids Code. All applicable federal, state and local regulations. Provide updates for any new Reporting and Training requirements

    Key dates

    1. November 3, 2025Posted Date
    2. November 7, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    F115--SOURCES SOUGHT NOTICE SPILL PREVENTION CONTROL AND COUNTERMEASURES PLAN (SPCCP) 5-YEAR REVIEW MARION, IL VA MEDICAL CENTER is a federal acquisition solicitation issued by DEPARTMENT OF VETERANS AFFAIRS. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.