Closed Solicitation · DEPARTMENT OF VETERANS AFFAIRS

    FIRE SUPPRESSION SPRINKLERS AT COATESVILLE VAMC

    DEPARTMENT OF VETERANS AFFAIRS
    Sol. 36C24426Q0415Combined Synopsis/SolicitationSet-aside: Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)PITTSBURGH, PA
    Closed
    STATUS
    Closed
    closed Jul 27, 2026
    POSTED
    Jul 22, 2026
    Publication date
    NAICS CODE
    811310
    Primary industry classification
    PSC CODE
    H312
    Product & service classification

    AI Summary

    The Department of Veterans Affairs is seeking a contractor for a five-year obstruction inspection and maintenance of sprinkler systems at the Coatesville VAMC. The work includes internal inspections, valve inspections, and hydrostatic testing, adhering to NFPA 25 standards. All work must be completed within 30 days of award, and the contractor must coordinate with the VA Point of Contact.

    Contract details

    Solicitation No.
    36C24426Q0415
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Service-Disabled Veteran-Owned Small Business (SDVOSB) Set-Aside (FAR 19.14)
    Posted Date
    July 22, 2026
    Response Deadline
    July 27, 2026
    NAICS Code
    811310AI guide
    PSC / Class Code
    H312
    Primary Contact
    Chris Clements
    State
    PA
    ZIP Code
    15215
    AI Product/Service
    service

    Description

    Amendment 0005

    - Deleted requirements for CLINs 0003 and 0004. No other substantive changes, all other requirements remain unchanged.


    Amendment 0004

    - Changed the Site visit time on the 9th to 10:00AM EST

    - Added attachment for contractors to provide notice of attendees: titled "Site Visit Information". Failure to submit this prior the Site Visit will result in admittance to tour the facilities- this will be strictly enforced. 

    Amendment 0003

    -Delected Base and Option Years for "Program Management"

    - Added: RFI Questions and Answers

    -Added: Sprinkler Inspection Reports

    Statement of Work

    Five-Year Obstruction Inspection of Sprinkler System

    Coatesville VA Medical Center

    1. Scope

    The contractor shall provide all labor, materials, equipment, and supervision required to perform the five-year obstruction inspection, testing, and maintenance of the facility’s sprinkler systems in accordance with NFPA (National Fire Protection Association’s) 25 and applicable codes. Work includes internal pipe assessments, valve inspections, FDC hydrostatic testing, hydrant flow testing, and replacement of sprinkler gauges.

    2. Applicable Standards

    All work shall comply with NFPA  25 (current edition) and VA policies and directives. 

    3. Requirements

    The contractor shall perform all NFPA 25‑required internal inspections, obstruction investigations, fire department connection (FDC) hydrostatic tests, hydrant flow tests, and sprinkler gauge replacements. The contractor shall coordinate all required system shutdowns with the designated VA Point of Contact (POC), adhere strictly to all VA safety protocols, and ensure that all work is performed by properly qualified technicians. All work shall be completed within 30 calendar days of award and shall be conducted Monday through Friday during administrative hours (8:00 a.m. to 4:30 p.m.). No work shall be performed on weekends or Federal holidays. All contractor personnel shall wear visible company identification badges displaying both the company name and the employee’s name.

    3.1. Building 1 Annual Inspection

    The contractor shall perform an annual fire pump inspection in the attic of Building 1 to ensure the stability and integrity of primary VAMC campus location. Flow testing at 100% rated capacity. Measurements of the suction pressure, discharge pressure and flow rate. Manufacturer’s pump curve compared to the current pump performance curve. Documentation of all readings, to include voltage and amperage. Compare to specifications and any deviations requiring corrective action. All equipment evaluations, diagnosis of equipment deficiencies and malfunctions, inspection and acceptance, as well as documentation of all tasks and services provided shall be furnished by the Contractor to the Coatesville VAMC PoC.

    3.2. Sprinkler System Maintenance & Internal Inspection

     A 5-year internal inspection cycle of sprinkler systems will be performed at the Coatesville VAMC Campus. The sprinkler systems gauges will be replaced at the following Buildings: 1, 2, 3, 4, 6, 7, 8, 9, 38, 39, 57, 59, 69, 138 and 139.  Building Maintenance will be spread over a 5 year period in which the contractor will have 30 calendar days to complete these services (maintenance, inspection and repairs) of each tranche of buildings. The schedules is as followed:

    Base Year- Services for Buildings 1, 2, 3

    Option Year 1- Services for Buildings 4, 6, 7

    Option Year 2- Services for Buildings 8, 9, 38

    Option Year 3- Services for Buildings 39, 57, 59

    Option Year 4- Services for Buildings 69, 138, 139

    Building maintenance will be grouped together with their respective contract years and will billed as one “job”. Each job shall include the following requirements: service, testing and inspection, maintenance, replacement of all necessary materials, and supplies. The contractor shall provide full maintenance services, including all adjustments, calibration, and tuning. As part of this service, the Contractor shall include diagnosis and evaluation of all equipment, any deficiencies, malfunctions, inspection and acceptance; as well as documentation of all tasks and services provided.

    3.3. Miscellaneous Maintenance Repairs

    Each repair shall include all service, testing and inspection. The Contractor shall provide all parts, materials, supplies, labor, supervision, tools, shipping, travel, and equipment necessary to resolve the deficiency or malfunction.

    4. Deliverables

    Contractor shall submit inspection reports to the VA POC within five business days after work completion. Reports must document inspection findings, deficiencies, photographic evidence where required, and recommended corrective actions.

    5. Government Responsibilities

    The VA POC will provide access to equipment, coordinate fire watch procedures if needed, and review contractor-submitted documentation.

    6. References

    The VA Fire Protection Design Manual (Attachment A) and the Fire Safety Guidebook (Attachment B) are the guidelines supporting this requirement.

    Key dates

    1. July 22, 2026Posted Date
    2. July 27, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FIRE SUPPRESSION SPRINKLERS AT COATESVILLE VAMC is a federal acquisition solicitation issued by DEPARTMENT OF VETERANS AFFAIRS. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.