Active Solicitation · DEPT OF DEFENSE

    FORT BENNING UESC RFP

    Sol. W912DY26RA071SolicitationREDSTONE ARSENAL, AL
    Open · 16d remaining
    DAYS TO CLOSE
    16
    closes Jul 29, 2026
    POSTED
    Jun 29, 2026
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    R425
    Product & service classification

    AI Summary

    The Department of Defense is seeking proposals for a Utility Energy Service Contract (UESC) to provide energy and water conservation services. The goal is to reduce consumption and associated costs while enhancing system resilience and modernizing infrastructure. The contract will cover the implementation of various energy and water conservation measures, with a focus on achieving operational efficiency.

    Contract details

    Solicitation No.
    W912DY26RA071
    Notice Type
    Solicitation
    Posted Date
    June 29, 2026
    Response Deadline
    July 29, 2026
    NAICS Code
    541330AI guide
    PSC / Class Code
    R425
    Contract Code
    2100
    Primary Contact
    Kara Malto
    State
    AL
    ZIP Code
    35898-0000
    AI Product/Service
    service

    Description

    The purpose of this UESC is to acquire energy and water conservation services, reduce energy or water consumption and associated utility costs, and reduce energy and water- related maintenance, repair and replacement (MRR) costs, as specified in each associated contract or task order (Contract). UESCs are used to obtain energy and/or water cost and/or energy unit savings through the implementation of various energy and/or water conservation measures (ECMs). As part of and in addition to achieving energy savings, UESCs may enhance the security and the resilience of energy and water systems, modernize infrastructure, and improve mission assurance through technologies including but not limited to distributed generation and energy storage technologies, continual/ongoing commissioning, and other technologies. MRR savings must be related to the ECM, that is, costs reduced or avoided by the implementation of one or more ECMs. The implementation period is the period between the date of Contract award and the date that all ECMs are completely installed/implemented by the Contractor, operational, and accepted by the Procuring Contracting Officer (PCO).

    Key dates

    1. June 29, 2026Posted Date
    2. July 29, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    FORT BENNING UESC RFP is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.