Closed Solicitation · DEPARTMENT OF AGRICULTURE

    GAOA 4FO SMCG TRAIL RENOVATION

    Sol. 1240LT26Q0027Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)SPARKS, NV
    Closed
    STATUS
    Closed
    closed Mar 31, 2026
    POSTED
    Feb 25, 2026
    Publication date
    NAICS CODE
    238990
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The Department of Agriculture - Forest Service is seeking contractors for the GAOA 4FO SMCG Trail Renovation project. This includes constructing an asphalt trail, earthwork, and installing a 36” culvert. The project emphasizes conserving existing materials and ensuring proper grading and compaction. Interested bidders should prepare for a comprehensive construction effort that meets specified design and material standards.

    Contract details

    Solicitation No.
    1240LT26Q0027
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    February 25, 2026
    Response Deadline
    March 31, 2026
    NAICS Code
    238990AI guide
    PSC / Class Code
    Y1LB
    Sub-Agency
    FOREST SERVICE
    Primary Contact
    Derrick Dodson
    City
    SPARKS
    State
    NV
    ZIP Code
    89431
    AI Product/Service
    service

    Description

    1. This project includes construction of an asphalt trail connecting the upper visitor center to the lower Acastus Trail and replacement of 36” cmp.
    2. Earthwork item includes clearing and grubbing, removing asphalt, excavation and embankment. Remove and conserve existing trail material. Grade and prepare native subbase. Existing trail material is to be conserved and used for shouldering and subgrade of resting pads. Shoulder trail slopes at 1:10 (max) with existing compacted trail material. It is the intention that all existing aggregate materials will remain onsite.
    3. Aggregate base shall be 4” depth below asphalt. Asphalt trail shall have 6’ width, 3” depth and 2% cross slope (max).
    4. Aggregate base, asphalt and concrete testing per FP-24.
    5. Resting pads shall be asphalt with 4’ width, 6’ length, 3” depth and 2% cross slope (max) in all directions. Resting pads aggregate base shall be compacted with water.
    6. Concrete curb shall be NDOT Type 5. Spillway to culvert inlet is inclusive to curb. Concrete curb may be placed on compacted aggregate base. Native subbase shall be compacted with water. The grade will be inspected for soft spots and accepted before concrete placement. Backfill to top of curb with native material.
    7.  Corrugated metal pipe item includes submitting a proposed pipe plot for placement of 36” culvert. Design for minimum 5% drop. Removal of existing culvert, inlet stacked rock and outlet riprap are inclusive to new culvert placement.
    8. All work to extend asphalt trail and shoulders is inclusive to the option items

    Key dates

    1. February 25, 2026Posted Date
    2. March 31, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    GAOA 4FO SMCG TRAIL RENOVATION is a federal acquisition solicitation issued by DEPARTMENT OF AGRICULTURE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.