Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Naval Sea Systems Command is seeking sources for the procurement of long lead time materials for U.S. Navy surface ships. Interested parties should provide a comprehensive capabilities statement detailing their ability to procure, store, and ship these materials, along with relevant past performance information. Submissions are due by July 31, 2025.
INTRODUCTION
This is a Sources Sought announcement in accordance with FAR 15.201 in anticipation of a potential future procurement program. The Naval Sea Systems Command (NAVSEA), Washington DC, is conducting market research and seeking information from potential sources able to procure, receive, store and ship long lead time materials (LLTM) associated with ship maintenance, repair and modernization availabilities completed on DDG-51, DDG-1000, CG, LCS, LPD, LSD, LHA and LHD class ships.
BACKGROUND
The NAVSEA Surface Warfare Directorate, SEA 21, is responsible for life-cycle management for all non-nuclear surface ship classes of the U.S. Navy including Surface Combatant Warfare Class Ships. In-service life cycle support of these ships comprises: integrated planning, programming, and execution of the maintenance and fleet modernization program, including the provision of all technical and logistics support required to maintain, modernize, and improve performance of the ships.
REQUIREMENT
NAVSEA is seeking contractors capable of completing expert services related to the procurement of LLTM for the aforementioned surface class ships. The scope associated with the Sources Sought notice includes, but is not limited to:
ACQUISITION STRATEGY
The Government is contemplating procuring this effort utilizing a Basic Ordering Agreement (BOA), with an ordering period duration of one 12-month base year and two 12-month option years.
CAPABILITIES AND CAPACITY STATEMENT
Interested parties shall submit a comprehensive Capabilities and Capacity Statement that describes the firm’s capabilities and capacity to meet the Government’s requirements, including the following:
(1) Positive statement of intent to bid as a prime contractor for the requirement.
(2) An outline of resources available to accomplish the proposed contract. Submittals must clearly distinguish in-house resources from sub-contracted resources and include the following areas:
The Government is not requesting interested parties to provide brochures and/or generalized sales-pitch language. Capability and capacity statements shall be specific (quantified as appropriate) and not theoretical in nature to the greatest extent practical.
Specifically, parties are requested to provide the following information (as applicable):
SUBMISSION DETAILS:
A PARTY’S SUBMISSION SHALL NOT EXCEED MORE THAN 20 DOC (MS Word) OR PDF PAGES IN LENGTH AND BE NO LARGER THAN 7.5GB.
Parties are responsible for adequately marking proprietary and/or competition sensitive information that is contained within their submission.
A party’s submission shall be delivered electronically either via encrypted email to Kevin Becker (kevin.r.becker2.civ@us.navy.mil) and Kathryn Corvello (kathryn.f.corvello.civ@us.navy.mil) or via drop on DOD SAFE. If a party chooses the drop on DOD SAFE option, the party shall coordinate the “drop” with Kevin Becker and Kathryn Corvello, whereby one of them will provide a DOD SAFE link for the drop.
The due date for submission is 31 July 2025 at 1500 EST.
DISCLAIMER:
This RFI is for Navy/information/planning purposes only. This announcement is not a request for proposal; it does not constitute any form of solicitation and shall not be construed as a commitment by the Navy. A party submission is not an offer nor proposal and the Navy is under no obligation to make any form of award as a result of this announcement. No funds will be provided by the Navy to pay for the preparation of submission in response to this announcement. All responses to this RFI are strictly voluntary.
All submitted materials will be designated for Government Use Only. Third party support contractors providing support to NAVSEA Surface Warfare Directorate, SEA 21, will have access to the submitted material. These contractors have executed non-disclosure agreements with SEA 21. Submission of material requested in this sources sought announcement shall constitute consent to allow access to the material/information by any relevant third-party support contractor supporting SEA 21. Submitted material/information will be safeguarded in accordance with the applicable Government regulations.
LONG LEAD TIME MATERIAL (LLTM) PROCUREMENT IN SUPPORT OF REPAIR, MAINTENANCE AND MODERNIZATION - US NAVY SURFACE SHIPS is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.