Closed Solicitation · DEPARTMENT OF TRANSPORTATION

    OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead

    Sol. 69056726B000009PresolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)VANCOUVER, WA
    Closed
    STATUS
    Closed
    POSTED
    Jul 15, 2026
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The project involves constructing a new multi-use trail, including a precast concrete arch culvert, drainage, and asphalt surface. Located near Hood River, OR, the estimated cost is between $5,000,000 and $10,000,000, with a completion date expected in late Winter/Spring 2028. This opportunity is a small business set-aside and will be solicited in Fall/Winter 2026.

    Contract details

    Solicitation No.
    69056726B000009
    Notice Type
    Presolicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 15, 2026
    Response Deadline
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Contract Code
    6925
    Primary Contact
    Contracts G. Office
    State
    WA
    ZIP Code
    98661
    AI Product/Service
    both

    Description

    PROJECT: OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead LOCATION: 4 miles west of Hood River, OR WORK: This project consists of a new multi-use trail, precast concrete arch culvert, clearing, excavation, grading, drainage, aggregate-base, asphalt surface course, temporary traffic control and permanent signage and striping. See “Project Description” posted under Attachments for additional details. LENGTH: 0.3 miles TENTATIVE COMPLETION DATE: Late Winter/Spring 2028 CONTRACT TYPE: Sealed Bid, firm-fixed-price ESTIMATED PRICE RANGE: Between $5,000,000 and $10,000,000. INTERESTED VENDORS LIST: To view the Interested Vendors List, you must register as a SAM user, be logged in, and linked to an entity. If you are signed into SAM.gov with your registered entity and you cannot see the Interested Vendors List, you will need to be assigned the Contract Opportunities Administrator role for your entity in SAM.gov. If you need assistance, go to https://www.fsd.gov/gsafsd_sp. THIS SOLICITATION IS OFFERED AS A SMALL BUSINESS SET-ASIDE. This project is anticipated to be solicited Fall/Winter 2026 To ensure you receive notification when the solicitation documents are posted to SAM.gov, please click on the “follow” button at the top of the opportunity page.

    Key dates

    1. July 15, 2026Posted Date

    AI search tags

    Frequently asked questions

    OR FLAP DOT CRGNSA 100(7), Historic Columbia River Highway State Trail, Mitchell Point Dr. to Ruthton Trailhead is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.