Active Solicitation · DEPT OF DEFENSE

    PAVEMENT CONDITION INSPECTION STUDIES FY26

    Sol. FA805126Q4001Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)TYNDALL AFB, FL
    Open · 21d remaining
    DAYS TO CLOSE
    21
    closes Aug 26, 2026
    POSTED
    Aug 5, 2026
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    R425
    Product & service classification

    AI Summary

    The USAF requires a contractor to conduct pavement condition evaluations and analyses for airfields and roads across various locations. The contractor will perform ASTM level inspections, update the pavement inventory, and manage the PAVER database, providing essential data for maintenance and planning. This opportunity is set aside for small businesses.

    Contract details

    Solicitation No.
    FA805126Q4001
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 5, 2026
    Response Deadline
    August 26, 2026
    NAICS Code
    541330AI guide
    PSC / Class Code
    R425
    Issuing Office
    FA8051 772 ESS PKD
    Primary Contact
    Mrs. Lisa Jones
    State
    FL
    ZIP Code
    32403-5322
    AI Product/Service
    service

    Description

    The United States Air Force (USAF), Air Force Civil Engineer Center (AFCEC), Operations Directorate, Airfield Pavements and Transportation Networks Branch (COSA), Tyndall AFB, FL, has a requirement to provide airfields and/or roads and parking pavement surface condition evaluations and corresponding analysis and deliverables at various locations across the Air Force enterprise.


    The contractor shall provide site evaluation and analysis in support of infrastructure condition assessments. The contractor shall provide technical expertise, labor, travel and all materials required to verify and/or update the pavement inventory and conduct American Society for Testing and Materials (ASTM) level pavement condition index (PCI) inspections to document specific distresses on the airfields and/or roads and parking areas at the installations in accordance with (IAW) the Performance Work Statement (PWS) (RFQ Attachment 1). As part of this effort, the contractor will create or update the PAVER pavement management system database, generate PCI/data tables/deliverables for use as planning data for maintenance, repair, and construction, and generate a separate deliverable package for the airfield and/or the roads and parking networks for each of the sites as outlined in the PWS.

    Key dates

    1. August 5, 2026Posted Date
    2. August 26, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PAVEMENT CONDITION INSPECTION STUDIES FY26 is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.