Closed Solicitation · DEPT OF DEFENSE

    Phase 1 for B-1 Secondary Power Torque Converter Re-Design

    Sol. MJM05282025Sources SoughtHILL AFB, UT
    Closed
    STATUS
    Closed
    closed Jun 12, 2025
    POSTED
    May 28, 2025
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    3010
    Product & service classification

    AI Summary

    The Department of Defense, specifically the Air Force, is seeking qualified contractors for Phase 1 of the B-1 Secondary Power Torque Converter redesign project, aimed at enhancing safety, reliability, and maintainability. This phase includes failure mode investigation, system requirements verification, and analysis of alternatives. Contractors must have experience in secondary power systems and may need access to proprietary data from Honeywell. Detailed performance requirements will be provided in a Statement of Objectives.

    Contract details

    Solicitation No.
    MJM05282025
    Notice Type
    Sources Sought
    Posted Date
    May 28, 2025
    Response Deadline
    June 12, 2025
    NAICS Code
    541330AI guide
    PSC / Class Code
    3010
    Contract Code
    5700
    State
    UT
    ZIP Code
    84056-5825
    AI Product/Service
    service

    Description

    The Government is preparing to issue an engineering services contract for Phase 1 of redesigning the B-1 Secondary Power Torque Converter. These redesign efforts shall be a comprehensive engineering initiative focused on enhancing the safety, reliability, and maintainability of the B-1 Torque Converter, which is essential to the operation of B-1 Bomber. The Government is seeking to do Phase 1 of this project to include failure mode investigation, study & analysis, a review of system requirements verification, and an analysis of alternatives. The existing Torque Converter design is proprietary to Honeywell INC. There is a certain amount of proprietary data involved with mating parts that may have to be obtained by the contractor. The work required for this contract should be by a qualified source which has experience in manufacturing, testing, and design secondary power systems and auxiliary power units. The design of this hardware is very complex and the highest engineering standards will be sought. Further details of the performance requirements will be addressed in a Statement of Objectives. The program is managed by the government, with contractors providing expert operational, technical, and engineering support to accomplish the objectives of this program. The primary goal is to improve the overall safety, reliability, and maintainability of the Torque Converter. To achieve this, contractors are tasked with researching and designing improvements and require access to OEM data for successful program performance.

    Key dates

    1. May 28, 2025Posted Date
    2. June 12, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Phase 1 for B-1 Secondary Power Torque Converter Re-Design is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.