Closed Solicitation · DEPARTMENT OF ENERGY

    PIP-II CDS Tunnel Warm Piping Installation

    DEPARTMENT OF ENERGY
    Sol. PIPII-366552-STESources SoughtSet-aside: Total Small Business Set-Aside (FAR 19.5)Batavia, IL
    Closed
    STATUS
    Closed
    closed Jun 5, 2025
    POSTED
    May 28, 2025
    Publication date
    NAICS CODE
    238220
    Primary industry classification
    PSC CODE
    N045
    Product & service classification

    AI Summary

    The Department of Energy is seeking interest for the PIP-II CDS Tunnel Warm Piping Installation project at Fermi National Accelerator Laboratory. This sources sought notice aims to gauge potential bidders for an upcoming solicitation, anticipated this summer. Interested parties must meet specific safety, bonding, insurance, and technical requirements and should email their interest to sandraef@fnal.gov. The project involves installing a warm piping system for the cryogenic distribution system in the accelerator tunnel.

    Contract details

    Solicitation No.
    PIPII-366552-STE
    Notice Type
    Sources Sought
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    May 28, 2025
    Response Deadline
    June 5, 2025
    NAICS Code
    238220AI guide
    PSC / Class Code
    N045
    Contract Code
    8900
    Primary Contact
    Sandra Efstathiou
    State
    IL
    ZIP Code
    60510
    AI Product/Service
    service

    Description

    THIS IS A SOURCES SOUGHT NOTICE TO GAUGE INTEREST IN A SOLICIATION THAT'S ANTICIPATED TO BE RELEASED THIS SUMMER. THIS IS NOT A SOLICITATION. IF YOU ARE INTERESTED IN RECEVING A SOLICITATION AND MEET SAFETY, BONDING, INSURANCE AND TECHNICAL REQUIREMENTS, PLEASE EMAIL YOUR INTEREST TO SANDRAEF@FNAL.GOV. NOTE: THE ATTACHED SPECIFICATION AND DRAWINGS MAY CHANGE PRIOR TO ISSUANCE OF THE SOLICITATION. The Proton Improvement Plan-II (PIP-II) is Fermi National Accelerator Laboratory’s (FNAL) plan for providing powerful, high-intensity proton beams to the laboratory's research program which includes an 800 MeV superconducting linac. In support of this program, the PIP-II project requires a new cryogenic distribution system (CDS). The Warm Piping System of CDS will provide room temperature helium gas to the PIP-II accelerator as well as recover and transport cold helium gas from the accelerator following a pressure relief event. This specification provides the basis for the piping installation contract for a portion of the CDS Warm Piping System. The scope of this specification shall be limited to the CDS Warm Piping system located in the accelerator tunnel. The piping system described in the specification will reside within the PIP-II Linac Tunnel, see attached SOW and drawing for more information.

    Key dates

    1. May 28, 2025Posted Date
    2. June 5, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PIP-II CDS Tunnel Warm Piping Installation is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.