Closed Solicitation · DEPARTMENT OF TRANSPORTATION
AI Summary
The Pittsburgh International Airport is seeking contractors for a project to refurbish its parking lot and sidewalks, with a submission deadline of May 23, 2025. The work includes removing and replacing concrete sidewalks, curbs, and gutters, milling and resurfacing asphalt pavement, refurbishing exterior door facades, parking lot striping, and repairing security chain-link fences. This solicitation falls under NAICS Code 238990 and is set aside for small businesses.
Scope: The Contractor shall supply materials, labor, tools, plant, supplies, equipment, transportation, superintendence, temporary construction of every nature, and other services and facilities necessary to complete the construction of the described works, including incidental work as necessary. B. Project description scope of work shall generally include: 1. Remove old concrete sidewalk and replace, 2. Remove temporary asphalt sidewalk and replace with concrete, 3. Remove and replace concrete curb and gutter,, 4. Milling and resurfacing asphat pavement, 5. Refurbish exterior door structural facade 6. Parking lot striping, 7. Security chainlink fence repairs
Pittsburgh International Airport (PIT) Refurbish Parking Lot and Sidewalk is a federal acquisition solicitation issued by DEPARTMENT OF TRANSPORTATION. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.