Closed Solicitation · DEPARTMENT OF ENERGY

    PLASMA ARC MELTING SYSTEM

    DEPARTMENT OF ENERGY
    Sol. PR396924SolicitationOak Ridge, TN
    Closed
    STATUS
    Closed
    closed Aug 6, 2025
    POSTED
    Jul 22, 2025
    Publication date
    NAICS CODE
    333992
    Primary industry classification
    PSC CODE
    3431
    Product & service classification

    AI Summary

    The Oak Ridge National Laboratory is seeking proposals for a pilot-scale plasma arc melting system designed for research on refractory metal alloys. The system must accommodate various feedstock types and provide precise control over melting conditions. Proposals should include installation, commissioning, and training, along with a list of recommended spare parts.

    Contract details

    Solicitation No.
    PR396924
    Notice Type
    Solicitation
    Posted Date
    July 22, 2025
    Response Deadline
    August 6, 2025
    NAICS Code
    333992AI guide
    PSC / Class Code
    3431
    Primary Contact
    Mckenzi Baz
    State
    TN
    ZIP Code
    37831
    AI Product/Service
    product

    Description

    Plasma Arc Melting System

    Oak Ridge National Laboratory (ORNL) is requesting proposals for a pilot-scale plasma arc melting system to support research on refractory metal alloys. The system must be adaptable for various feedstock types and melting conditions, with precise control over heat input, melt rate, and gas environment. Key specifications include:
     
    Melter Characteristics:
     
    Plasma Torch System: Programmable motion control with multiple plasma torches and controlled gas delivery.
    Cooling System: Closed-loop water cooling for heat-sensitive components, with integrated manifold and valves.
    Material Feeding: Capability to handle compacted powder, turnings, and scrap, with optional bar feeders.
    Ingot Forming: Vertical ingot formation in induction-heated molds, producing solid ingots (max: 100 mm x 100 mm x 1000 mm; min: 50 mm diameter x 1000 mm).
    Melting Rate: Minimum of 1000 cc/hour for refractory metals.
    Operational Safety & Integration:
     
    Must include necessary framing, enclosures, and controls for safe lab operation, complying with safety codes.
    Proposals should cover installation, commissioning, training, and a list of recommended spare parts and consumables.
    Utility Requirements:
     
    Power: 480 V, 3-phase, 60 Hz, ≤1200 KVA total demand.
    Gases: Helium and argon at 120 psi.
    Cooling Water: 350 gallons per minute from a tower loop and 80 gallons for emergency use.
    Facility Constraints:
     
    Max footprint: 35 ft (L) x 28 ft (W) x 25 ft (H), supported by an 11-inch thick concrete slab, with no below-grade installation required.

    Key dates

    1. July 22, 2025Posted Date
    2. August 6, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    PLASMA ARC MELTING SYSTEM is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.