Closed Solicitation · DEPARTMENT OF ENERGY

    REQUEST FOR INFORMATION THAT COULD AID IN THE STUDY OF OPTIMIZING THE UTILIZATION OF FEDERAL PUMPED STORAGE HYDROPOWER ASSETS AND NEW TRANSMISSION PATHS BETWEEN 2 EASTERN INTERCONNECTION TRANSMISSION PLANNING REGIONS.

    DEPARTMENT OF ENERGY
    Sol. SEPA_RFI_3_19_24Sources SoughtELBERTON, GA
    Closed
    STATUS
    Closed
    closed Apr 8, 2024
    POSTED
    Mar 19, 2024
    Publication date
    NAICS CODE
    541330
    Primary industry classification
    PSC CODE
    B513
    Product & service classification

    AI Summary

    The Southeastern Power Administration, under the Department of Energy, is seeking information from potential vendors for a project related to optimizing the utilization of federal pumped storage hydropower assets and new transmission paths between two Eastern Interconnection transmission planning regions. Interested contractors are invited to provide information on how they could contribute to this study. The deadline for submissions is April 8, 2024, at 5:00 PM Eastern Time.

    Contract details

    Solicitation No.
    SEPA_RFI_3_19_24
    Notice Type
    Sources Sought
    Posted Date
    March 19, 2024
    Response Deadline
    April 8, 2024
    NAICS Code
    541330AI guide
    PSC / Class Code
    B513
    Contract Code
    8900
    Primary Contact
    Carter Edge
    State
    GA
    ZIP Code
    30635

    Description

    SOUTHEASTERN POWER ADMINISTRATION is seeking information from potential vendors that may be interested in bidding on an upcoming project pertaining to how an interested contractor could aid in the study of optimizing the utilization of federal pumped storage hydropower assets and new transmission paths between two Eastern Interconnection transmission planning regions. Southeastern is in need of two separate studies: The first project objective consists of a study that would weigh options that would increase the transfer capability between Georgia and South Carolina, by performing a feasibility study for necessary actions which would establish a new interconnection with an investor-owned 230kV transmission line in South Carolina. The second study should be options to derive the additional energy from pumping performing a capacity expansion study quantifying the theoretical increase in firm system capacity that can be derived from pumping. Study 1 and Study 2 are independent and may be completed in parallel.

    Key dates

    1. March 19, 2024Posted Date
    2. April 8, 2024Proposals / Responses Due

    Frequently asked questions

    REQUEST FOR INFORMATION THAT COULD AID IN THE STUDY OF OPTIMIZING THE UTILIZATION OF FEDERAL PUMPED STORAGE HYDROPOWER ASSETS AND NEW TRANSMISSION PATHS BETWEEN 2 EASTERN INTERCONNECTION TRANSMISSION PLANNING REGIONS. is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.