Active Solicitation · DEPT OF DEFENSE

    Scaffolding Supply and Installation for Keystone Lake Powerhouse, OK

    Sol. W912BV26QA077SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)TULSA, OK
    Open · 4d remaining
    DAYS TO CLOSE
    4
    closes Jul 17, 2026
    POSTED
    Jul 2, 2026
    Publication date
    NAICS CODE
    238990
    Primary industry classification
    PSC CODE
    5440
    Product & service classification

    AI Summary

    The United States Army Corps of Engineers requires a contractor for scaffolding supply and installation at the Keystone Powerhouse in Oklahoma. This includes new tube and coupler scaffolding, engineered designs for multiple locations, and safety equipment. All materials will become government property upon delivery and acceptance. Quotes must be submitted via the PIEE Solicitation Module by July 17, 2026.

    Contract details

    Solicitation No.
    W912BV26QA077
    Notice Type
    Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    July 2, 2026
    Response Deadline
    July 17, 2026
    NAICS Code
    238990AI guide
    PSC / Class Code
    5440
    Contract Code
    2100
    Issuing Office
    W076 ENDIST TULSA
    Primary Contact
    Lee Maddox
    City
    TULSA
    State
    OK
    ZIP Code
    74137-4290
    AI Product/Service
    both

    Description

    The United States Army Corps of Engineers - Tulsa District has requirements for a scaffolding supply and installation contract. The contractor will provide supplies, materials, engineered scaffolding design, and scaffolding installation service for the Keystone Powerhouse, as well as engineered scaffolding designs for three (3) additional locations. The scaffolding must be new, tube and coupler type. The work also includes the procurement and delivery of a deployable cable ladder and safety equipment. All supplied items (scaffolding materials, deployable cable ladder, and safety equipment) will become the property of the Government after delivery of all materials to the Keystone powerhouse and after official acceptance of the scaffolding installation at the Keystone powerhouse. The NAICS code is 238990; PSC code is 5440. THE ONLY AUTHORIZED TRANSMISSION METHODS FOR SUBMITTING QUOTES IN RESPONSE TO THIS SOLICITATION IS THROUGH THE PIEE SOLICITATION MODULE WEBSITE AT: https://piee.eb.mil. NO OTHER TRANSMISSION METHODS (FACSIMILE, REGULAR MAIL, HAND CARRIED, ETC.) WILL BE ACCEPTED. Amendment 0001 is to extend the Solicitation period to 17 July 2026, 2:00 PM Central.

    Key dates

    1. July 2, 2026Posted Date
    2. July 17, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Scaffolding Supply and Installation for Keystone Lake Powerhouse, OK is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.