Closed Solicitation · DEPARTMENT OF ENERGY
AI Summary
The Southeastern Power Administration is looking for a vendor to conduct a study aimed at optimizing pumped storage and enhancing transfer capability. The study is intended to improve energy efficiency and grid reliability in the region. Interested parties can find detailed information in the attached request for proposal document. The deadline for submissions is July 22, 2024, at 12:00 PM Eastern Time.
Southeastern Power Administration is seeking a vendor to provide a study to increase pumped storage optimization and increased transfer capabilty. Attached is a request for propsal with all pertinent information.
SOUTHEASTERN POWER GDO-STUDY FOR PUMPED STORAGE OPTIMIZATION AND INCREASED TRANSFER CAPABILITY is a federal acquisition solicitation issued by DEPARTMENT OF ENERGY. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.