Closed Solicitation · DEPT OF DEFENSE
AI Summary
The Department of Defense is seeking capability statements for comprehensive engineering support services at Tinker Air Force Base. This opportunity involves cradle-to-grave project management and technical support, with a focus on infrastructure portfolio management. Interested parties should prepare for an upcoming Industry Day and review the attached draft documents.
4 August 2026
Posting Presentation Slides
Posting Industry Day Sigh-In
Extend Inactive Date for Posting to 15 August 2026
========================================================================
July 2, 2026
Industry Day
July 22, 2026
See attached agenda for details.
===================================================
Updated 18 June 2026
Attached correct version of PWS Draft.
17 June 2026
Draft PWS and Draft CDRLS have been uploaded for review.
Industry Day is being planned and will be announced at a later date.
==================================================================================================
1.0 BACKGROUND AND OBJECTIVE
The 72d Civil Engineer Directorate (72 ABW/CE) at Tinker Air Force Base (TAFB), Oklahoma, is seeking capability statements from qualified industry partners to provide comprehensive, cradle-to-grave engineering project management, execution, and technical support services. The objective of this acquisition is to secure an agile, innovative, and highly qualified engineering workforce to manage the installation's built infrastructure portfolio.
2.0 CONTRACT STRUCTURE & STRATEGIC INTENT
The Government anticipates an IDIQ contract utilizing both Firm-Fixed Price (FFP) and FFP Level of Effort (LOE) Contract Line Item Numbers (CLINs) to address baseline workload, surge capacity, and specialized workload as appropriate. A critical strategic imperative of this contract is the support of the Government’s long-term workforce and insourcing strategy. The successful offeror must be capable of providing comprehensive knowledge transfer, developing rigorous Standard Operating Procedures (SOPs), and seamlessly transitioning specific functions to Government performance over the life of the contract.
3.0 SCOPE OF WORK SUMMARY
The scope of work is divided into two primary categories:
3.1. Baseline FFP-LOE Scope (Core Workload):
The contractor shall provide an optimally sized, on-site support team to execute the daily, continuous functions of the CEN portfolio, including:
3.2. Orderable IDIQ Scope (Surge & Specialized Workload):
The contractor shall maintain the capacity (including corporate reach-back) to dynamically scale support for discrete, project-specific task orders, including:
4.0 KEY PERSONNEL & QUALITY REQUIREMENTS
The Government requires a highly credentialed workforce to mitigate risk and ensure technical rigor. Key Personnel requirements include, but are not limited to:
Furthermore, strict adherence to data integrity is paramount. The contractor will be required to manage project data accurately and timely within designated Government IT systems of record (e.g., NexGen IT, Kahua) and will be evaluated against stringent Quality Performance Indicators (QPIs) tied to schedule adherence, cost estimating accuracy, construction cost control, and data accuracy.
TINKER BASE ENGINEERING SUPPORT SERVICES (TBESS) SOURCES SOUGHT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.