Closed Solicitation · DEPT OF DEFENSE

    USAFA WIND TUNNEL AIR TANK LEAK REPAIR

    Sol. FA700025Q0121Combined Synopsis/SolicitationSet-aside: Total Small Business Set-Aside (FAR 19.5)USAF ACADEMY, CO
    Closed
    STATUS
    Closed
    closed Aug 14, 2025
    POSTED
    Aug 6, 2025
    Publication date
    NAICS CODE
    238220
    Primary industry classification
    PSC CODE
    J043
    Product & service classification

    AI Summary

    The USAFA requires a contractor for leak repair of the Trisonic Wind Tunnel Air Tank, which is critical for safety due to high-pressure air storage. The project involves six tanks, each 68ft long and 5ft in diameter, and requires a Firm-Fixed Price quote. This is a non-personal service contract with no government supervision over contractor personnel.

    Contract details

    Solicitation No.
    FA700025Q0121
    Notice Type
    Combined Synopsis/Solicitation
    Set-Aside
    Total Small Business Set-Aside (FAR 19.5)
    Posted Date
    August 6, 2025
    Response Deadline
    August 14, 2025
    NAICS Code
    238220AI guide
    PSC / Class Code
    J043
    Issuing Office
    FA7000 10 CONS LGC
    State
    CO
    ZIP Code
    80840-2303
    AI Product/Service
    service

    Description

    This is an appropriated fund requirement for non-personal one-timeservice contractors to provide leak repair for the Trisonic Wind Tunnel Air Tank at the United States Air Force Academy (USAFA). The Government shall not exercise any supervision over contractor personnel. Contractor personnel shall be accountable solely to the primary contractor who in turn is responsible to the Government.

    The Dean of Faculty Department of Aeronautics (DFAN) has a requirement to repair leaks in the air supply tanks for the Trisonic Wind Tunnel. These tanks hold air at pressures up to 600 psi, so a proper seal of the tanks is a critical safety issue. Should the tanks fail, severe property damage, injury or death could likely occur. There are six tanks, each approximately 68ft long and 5ft in diameter. The tanks are connected in a series to produce one air supply; one tank has a heat sink installed inside; maximum
    pressure is 600psi.

    Prices quoted must be Firm-Fixed Price based on F.O.B Destination.

    Key dates

    1. August 6, 2025Posted Date
    2. August 14, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USAFA WIND TUNNEL AIR TANK LEAK REPAIR is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.