Active Solicitation · DEPT OF DEFENSE

    USS BOXER (LHD-4), ALCO MODEL 251C LONG LEAD TIME MATERIAL (LLTM) REPLACEMENT

    Sol. N5523626R0009Combined Synopsis/SolicitationSAN DIEGO, CA
    Open · 8d remaining
    DAYS TO CLOSE
    8
    closes Jul 1, 2026
    POSTED
    Jun 18, 2026
    Publication date
    NAICS CODE
    333618
    Primary industry classification
    PSC CODE
    2815
    Product & service classification

    AI Summary

    The Department of Defense is seeking proposals for long lead time materials for the USS BOXER (LHD-4) under a sole source procurement with Fairbanks Morse Defense. This opportunity is classified under NAICS code 333618 for other engine equipment manufacturing and is not open for competitive proposals.

    Contract details

    Solicitation No.
    N5523626R0009
    Notice Type
    Combined Synopsis/Solicitation
    Posted Date
    June 18, 2026
    Response Deadline
    July 1, 2026
    NAICS Code
    333618AI guide
    PSC / Class Code
    2815
    Primary Contact
    MIRA MAJE Brown
    State
    CA
    ZIP Code
    92136-5205
    AI Product/Service
    product

    Description

    This is a Combined Synopsis/Solicitation for commercial products prepared in accordance with the format in Part 12. This announcement constitutes the only solicitation. A proposal is being requested from only one source. Request for Proposal (RFP) N5523626R009 is issued as a sole source procurement. The subject solicitation is being processed in accordance with FAR Part 12. The Government intends to solicit and contract with only one source, Fairbanks Morse Defense (referred to herein a s Fairbanks Morse) for the part listed on the Product Description (Attachment J-1), under the authority of FAR 12.102 on a sole source basis. This notice of intent is not a request for competitive proposals. Determination by the Government not to compete with this proposed contract based upon responses to this notice is solely within the discretion of the Government. The applicable North American Industry Classification System (NAICS) code is 333618 ? Other Engine Equipment Manufacturing. This solicitation incorporates provisions and clauses by reference. The full text of FAR and DFAR references, provisions and clauses may be accessed at https://acquisition.gov. Please see the attachment, 26R0009__USS_Boxer_RFP_Syn_Sol for the full combined solicitation/synopsis notice for this requirement.

    Key dates

    1. June 18, 2026Posted Date
    2. July 1, 2026Proposals / Responses Due

    AI search tags

    Frequently asked questions

    USS BOXER (LHD-4), ALCO MODEL 251C LONG LEAD TIME MATERIAL (LLTM) REPLACEMENT is a federal acquisition solicitation issued by DEPT OF DEFENSE. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.