Closed Solicitation · DEPARTMENT OF THE INTERIOR

    Y--ZION 240182, SOUTH ENTRANCE AND VISITOR CENTER ROAD REHABILITATION, ZION NATION

    Sol. 140P2025R0115Sources SoughtDENVER, CO
    Closed
    STATUS
    Closed
    closed Sep 2, 2025
    POSTED
    Aug 18, 2025
    Publication date
    NAICS CODE
    237310
    Primary industry classification
    PSC CODE
    Y1LB
    Product & service classification

    AI Summary

    The opportunity involves the rehabilitation of the South Entrance and Visitor Center Road at Zion National Park, including roadway and bridge construction, drainage installation, and utility reconstruction. The project requires maintaining traffic access to visitor facilities throughout the work phases. Interested parties should respond to this sources sought notice.

    Contract details

    Solicitation No.
    140P2025R0115
    Notice Type
    Sources Sought
    Posted Date
    August 18, 2025
    Response Deadline
    September 2, 2025
    NAICS Code
    237310AI guide
    PSC / Class Code
    Y1LB
    Primary Contact
    Dyer, Rachel
    City
    DENVER
    State
    CO
    ZIP Code
    80225
    AI Product/Service
    service

    Description

    Installation of roadways and a bridge within the project limits, including earthwork, grading, base course, and surfacing. Installation of a roundabout at the entrance to the Visitor Center at Visitor Center Road. This project requires at all times that traffic be maintained to the visitor facilities and bus maintenance facilities.
    Installation of signs and striping throughout the project site.
    Installation of drainage infrastructure to accommodate surface flows throughout the site. The infrastructure includes underground culverts in addition to ditches and swales.
    Installation of landscaping treatments of impacted areas, including restoration areas of existing hardscaped/paved features to be abandoned.
    Reconstruction of utilities (water, sanitary, electric, communications) to accommodate the infrastructure identified in this section.
    Work shall be conducted in 4 phases in the following order, with each phase substantially complete before beginning the subsequent phase:
    Phase 1: Phase 1 shall consist of the construction the new roadway, bridge, roundabouts, parking lot, and trail elements that can be constructed outside of the existing roadway and parking lot network.
    Phase 2: Phase 2 shall consist of the construction of the connecting pieces of the roadway network crossing the existing roadway network, phased in such a way to maintain access to the Visitor Center parking lot, Watchman Campground, the shuttle bus charging and parking lot, the employee parking lot, and the oversized vehicle lot.
    Phase 3: Phase 3 shall consist of the construction of the northern half of the oversized vehicle lot and the eastern half of the employee parking lot. Phase 3 work can occur concurrent with Phases 1, 2, and 4 work, assuming visitor, bus, and employee access is maintained throughout the site.
    Phase 4: Phase 4 shall consist of the construction of the southern half of the oversized vehicle lot and the western half of the employee parking lot. Phase 4 work can occur concurrent with Phases 1, 2, and 3 work, assuming visitor, bus, and employee access is maintained throughout the site.

    Key dates

    1. August 18, 2025Posted Date
    2. September 2, 2025Proposals / Responses Due

    AI search tags

    Frequently asked questions

    Y--ZION 240182, SOUTH ENTRANCE AND VISITOR CENTER ROAD REHABILITATION, ZION NATION is a federal acquisition solicitation issued by DEPARTMENT OF THE INTERIOR. Review the full description, attachments, and submission requirements on SamSearch before the response deadline.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.