Active SLED Opportunity · TEXAS · NORTH TEXAS TOLLWAY AUTHORITY
AI Summary
Request for bids for continuous roadway illumination construction on President George Bush Turnpike from Dallas North Tollway to SH 78, including installation of lighting infrastructure and electrical services.
Continuous Illumination of the mainlanes and ramps along the President George Bush Turnpike from the Dallas North Tollway to SH 78. Construction will consist of removal of existing and installation of proposed roadway illumination, and high mast poles including foundations, underpass lighting, conduits, ground boxes, conductors, electrical services, and structural light brackets. Pre Bid Conference: A virtual pre-bid conference will be held on June 5, 2026, at 11:30 AM CT., refer to solicitation for link details.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.