SLED Opportunity · OHIO · CITY OF WILMINGTON
AI Summary
City of Wilmington seeks materials for a new vehicular bridge over Lytle Creek at the landfill. Bid Package No. 1 includes steel beam components and concrete deck materials to be delivered by October 5, 2026.
Project: 2026 Materials Only Landfill Bridge Over Lytle Creek Contract ID: 2026-002 Design Engineer: Fishbeck Location: Wilmington Landfill 397 S. Nelson Ave. Wilmington, OH 45177 Project Deadline: Materials Delivery by October 5, 2026 Engineer's Estimate: $143,193.41 Overview:The City intends to construct a new vehicular bridge in 2026 to access the City's property over Lytle Creek to ensure continual operations by the City's Landfill Department. The bridge will be a single span galvanized rolled steel beam superstructure with a composite reinforced concrete deck on integral abutments. The bridge will be advertised in two separate packages: Bid Package No. 1 includes bridge components with sensitive material and fabrication lead times and Bid Package No. 2 includes the remaining portion of the structure and installation of components for both Bid Packages No. 1 and 2. This advertisement is for Bid Package No. 1, which includes identified bridge components to be ordered and delivered to the City.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.