Active SLED Opportunity · GEORGIA · COBB COUNTY-MARIETTA WATER AUTHORITY
AI Summary
Coatings project for pipes and equipment at three water treatment facilities in Cobb County, GA. Mandatory pre-bid conference and prequalification required. Bids due July 8, 2026.
The Project will result in coating pipes, equipment, and other items at the Hugh A. Wyckoff Water Treatment Plant (Wyckoff WTP), located at 3728 Mars Hill Road, Acworth, Georgia 30101; the James E. Quarles Water Treatment Plant (Quarles WTP), located at 4402 Lower Roswell Road, Marietta, Georgia 30068, and the Groover Mountain Pump Station (Groover Mountain PS), located at 1700 East Piedmont Road, Marietta, Georgia 30062.
## Details **Bid/Project ID:** PE-66365-NONST-2026-000000033 **Type of Work:** Coatings of Pipes, Equipment, and Other Items **Pre-Bid Location:** Quarles WTP Training Room, 4402 Lower Roswell Rd, Marietta, GA 30068 **Pre-Bid Notes:** Mandatory Pre-Bid Conference and Site Visits **Bid Location:** 1170 Atlanta Industrial Drive, Marietta, GA 30066 **Engineer/Publisher:** Hazen and Sawyer **Engineer Address:** 211 PERIMETER CENTER PARKWAY, SUITE 300, Atlanta, Georgia, 30346 ## Additional Notes Pre-qualification of Bidders is required. Only Bids submitted by properly pre-qualified Bidders will be opened. The Pre-qualification Application is included in the Bid Documents (see Section 00415). Pre-qualification Applications (including all supporting documentation) are due NO LATER THAN 4:00 pm, LOCAL TIME, JUNE 18, 2026.SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.