    The City of Morgan Hill seeks sealed bids for the 2026 Sewer Inflow and Infiltration Project involving sewer repair work at various city locations. The project includes inspection, excavation, and repair with an estimated cost of $1.9M and completion within 210 days.

    Opportunity details

    Solicitation No.
    208829
    Type / RFx
    Public Bid
    Status
    Active
    Level
    city
    Published Date
    Due Date
    March 4, 2026
    NAICS Code
    237110AI guide
    Agency
    City of Morgan Hill

    Description

    Bid Submission. The City of Morgan Hill (“City”), will accept sealed bids for its 2026 Sewer Inflow and Infiltration Project (“Project”), by or before March 4, 2026, at 1:30 p.m., at its DEVELOPMENT SERVICES CENTER, located at 17575 PEAK AVENUE MORGAN HILL, California, at which time the bids will be publicly opened and read aloud. Project Information. Location and Description. The Project is located at various locations within the City of Morgan Hill, CA 95037, and is described as follows: The Project sites are within existing City streets and along City easements at various locations in the City of Morgan Hill, and is described as follows: The project scope is to locate, video, and mark the locations of all proposed excavations for sewer repair work (Open Trench, Lining, and Point Repair), review the proposed work with the City and receive written approval for proceeding to complete the sewer repair on all these locations as stated on the improvement plans. Time for Final Completion. The Project must be fully completed within 210 calendar days from the start date set forth in the Notice to Proceed. City anticipates that the Work will begin on or about May 2026, but the anticipated start date is provided solely for convenience and is neither certain nor binding. Estimated Cost. The estimated construction cost is $1,900,000. 01/30/2026: THIS IS NOT AN ADDENDUM - SPECIFICATIONS AND PLANS ADDED. 01/30/2026: THIS IS NOT AN ADDENDUM - TECHNICAL SPECIFICATIONS ADDED TO DOCUMENT. --- QUESTIONS AND ANSWERS --- Q: Specifications state that "All new sewers, structures, manholes, and new laterals installed as shown in the Contract Documents shall be visually inspected by means of closed-circuit television (CCTV) and video recorded after testing and cleaning activities. Unfortunately, recent studies confirm that CCTV misses 80-100% of sources for infiltration and/or exfiltration and should not be used either for pre-rehabilitation assessments of post-rehabilitation certification of watertight repairs or rehabilitation. Can contractors recommend Focused Electrode Leak Location (FELL), also referred to by the USEPA as electrical resistance testing to provide 100% locational accuracy and estimated gallons per minute defect flows of all leak locations. It doesn't appear to make sense to use visual-based cameras if they cannot reliably determine superficial cracks from cracks that go through a pipe wall, are unable to confirm service tap watertight conditions, and report false:positive results of pipe joints due to its inability to test 360-degree watertightness through bell & spogots. A: No answer provided yet.

    Key dates

    1. March 4, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.