Active SLED Opportunity · CALIFORNIA · DONNER SUMMIT PUD
AI Summary
Invitation for Bid to rehabilitate 21,000 sq ft of asphalt pavement at Donner Summit PUD with cold planing and fiber-reinforced hot mix asphalt overlay, including utility adjustments and site access maintenance. Bid due 08/17/2026 electronically to Donner Summit PUD in California.
Rehabilitate approximately 21,000 square feet of existing asphalt concrete pavement by cold plane (grinding) the existing surface to a depth of 0.17 foot (2-inches), and constructing a 2-inch (0.17) overlay of fiber-reinforced hot mix asphalt (HMA-FR), including tack coat, utility adjustments, maintaining site access, and all related and incidental work shown on the plans or... **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2563617.C15914451 **Piggyback Contract**: No **Question Acceptance Deadline**: 08/10/2026 05:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Reference Number**: 0000432697 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Line Items**: | description | quantity | uom | |---|---|---| | Mobilization, Insurance, Bonds | 1.0 | Lump-Sum | | Maintain Site Access | 1.0 | Lump-Sum | | Water Pollution Control Plan | 1.0 | Lump-Sum | | Cold Plane Asphalt Concrete (2-in) | 21000.0 | Square Foot/Feet | | Full Depth Pavement Repair (4-in) | 505.0 | Square Foot/Feet | | Crack Seal | 21000.0 | Square Foot/Feet | | Hot Mix Asphalt Fiber Reinforced Overlay (2-in) | 266.0 | Ton |
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.