University of Utah seeks bids for Central Campus Water Phase 1 Road Reconstruction including waterline installation, asphalt replacement, sidewalks, and landscaping. Mandatory pre-bid meeting on June 30, 2026. Bids due July 15, 2026.
INVITATION TO BID Sealed bids will be received by the University of Utah (U Facilities) for: Central Campus Water – Phase 1 Rd Reconstruction University PROJECT #22944 Project Description: See Project Description and contact information on page 4. Construction Cost Estimate: $4,120,460.00 The bid documents will be available 3:00 PM on June 17, 2026 on the BidNet Direct website . A MANDATORY pre-bid meeting and site visit will be held at 10:00 AM on June 30, 2026. Please meet at the NE corner of the Union Building near the bus area located at 200 S Central Campus Dr. All contractors wishing to bid on this project must attend this meeting. Bids are to be submitted electronically until 2:00 PM on July 15, 2026 through the BidNet Direct website. It is the sole responsibility of the contractor to ensure their bid reaches the BidNet Direct website before the closing date and time. There is no cost to the contractor to submit electronic bids the BidNet Direct website. Bids may require the uploading of attachments. The submission of attachments containing embedded documents (i.e., zip files, .mov, wmp, and mp3 files, etc.) is prohibited. All documents should be attached as separate files. For questions relating to BidNet Direct, please call 1-800-835-4603, Option 2 or email them at support@bidnet.com. Any bids over $100,000 will require a 100% Payment and Performance Bond to be included with the cost of your bid. Failure to provide this cost information may result in being deemed non-responsive. The University of Utah reserves the right to reject any or all bids or to waive any formality or technicality in any bid in the interest of the University. PROJECT DESCRIPTION Contact Information: Project Specific Questions: Refer to Project Schedule for deadline. All questions are to be submitted through the BidNet Direct website. University Project Manager: Jenni Oman | 801-587-1760 | jenni.oman@utah.edu Project Description/Base Bid: Install 2,375 ft of 10" PVC waterline, including valves, bends, tees, 4",6", 8" service lines and two 18" valves at connection point, installing 5 new hydrants, asphalt replacement outside Central Campus Rebuild Phase 1 limits of construction. Central Campus Rebuild Phase 1 includes removal and disposal of existing asphalt, installation of bioswales, bike lane, sidewalk, curb/gutter, colored concrete intersection with block U, pedestrian lighting relocation/replacement, landscaping. And all other items necessary to do work described in the plans. Additive Alternates: N/A Notes/Additional Information: N/A Construction Cost Estimate: $4,120,460.00 Liquidated Damages: $1,000.00/Day Tax Exempt: YES **Project Type**: IFB - Invitation for Bid (Formal) **Source ID**: PU.AG.USA.2756265.2756267.C18581901 **Piggyback Contract**: No **Question Acceptance Deadline**: 07/08/2026 06:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Reference Number**: 0000428102 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Bid Documents | Documents defining the proposal | No | No | **Pre-Bidding Events**: Event Type: Job-Walk Visit | Attendance: Mandatory | Event date: 06/30/2026 12:00 PM EDT | Location: 200 S Central Campus Dr, SLC, UT 84112 | Event Note: A MANDATORY pre-bid meeting and site visit will be held at 10:00 AM on June 30, 2026. Please meet at the NE corner of the Union Building near the bus area located at 200 S Central Campus Dr. All contractors wishing to bid on this project must attend this meeting.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.