SLED Opportunity · TEXAS · HARRIS COUNTY

    26/0145 - ITB - Construction of the Meyergrove Stormwater Detention Basin - Phase 2 - for the Harris County Flood Control District (FEMA)

    Issued by Harris County
    countyITBHarris CountySol. 235473
    Closed
    STATUS
    Closed
    due Invalid Date
    PUBLISHED
    Invalid Date
    Posting date
    JURISDICTION
    Harris County
    county
    NAICS CODE
    237990
    AI-classified industry

    AI Summary

    Harris County ITB for construction of the Meyergrove Stormwater Detention Basin - Phase 2, including heavy construction and clearing services. Key dates: open May 15, 2026; pre-bid conference May 26; questions due May 29; close June 15, 2026.

    Opportunity details

    Solicitation No.
    235473
    Type / RFx
    ITB
    Status
    Open
    Level
    county
    Published Date
    Invalid Date
    Due Date
    Invalid Date
    NAICS Code
    237990AI guide
    Jurisdiction
    Harris County
    State
    Texas
    Agency
    Harris County

    Description

    Construction of the Meyergrove Stormwater Detention Basin - Phase 2 - for the Harris County Flood Control District - Project ID: D500-16-00-E001

    Commodity Codes

    • Commodity Codes: NIGP 912 Construction Services, General (Incl. Maintenance And Repair Services) NIGP 913 Construction Services, Heavy (Incl. Maintenance And Repair Services) NIGP 91219 Clearing and Grubbing Services

    Events & Timeline

    StatusEvent NameLocationDescriptionDatesMandatory
    OngoingOpen DateOnline PortalPosting date for the OpportunityMay 15th 2026, 11:00 AM CDTN/A
    UpcomingPre-Bid ConferenceMicrosoft Teams (Audio Teleconferencing)The Voluntary Pre-Bid conference will be held at 11:00AM on Tuesday, May 26, 2026, via Microsoft Teams. https://teams.microsoft.com/meet/259511843321142?p=bhQR8dohfOSY9LqAZN Join the meeting now Meeting ID: 259 511 843 321 142 Passcode: qe75YW7q or call in (audio only) +1 281-985-1862, Phone Conference ID:570 130 105##May 26th 2026, 11:00 AM CDT - May 26th 2026, 12:00 PM CDTNo
    UpcomingQuestions Due DateOnline PortalDeadline to submit QuestionsMay 29th 2026, 12:00 PM CDTN/A
    UpcomingClose DateOnline PortalDeadline for SubmissionsJun 15th 2026, 2:00 PM CDTN/A

    Requested Information

    Note: Template files for the items below (BidTables, Questionnaires) are available in the Attachments section of this opportunity.

    NameType# FilesRequirementInstructionsActions
    Estimated Contract ValueData Type: NumberN/ARequired
    Bid BondData Type: Yes/NoN/ARequired
    Bid CheckData Type: Yes/NoN/ARequired
    Copy of Bid Bond or Bid CheckFile Type: PDF (.pdf)MultipleRequired
    Acceptance of General Requirements for Bids and Grant RequirementsData Type: Yes/NoN/ARequired
    Attachment A - Bid & Addenda AcknowledgementFile Type: PDF (.pdf)MultipleRequired
    Attachment C - Certification of LobbyingFile Type: PDF (.pdf)MultipleRequired
    Attachment D - Statement of Offeror QualificationsFile Type: PDF (.pdf)MultipleRequired
    Attachment F - ReferencesFile Type: PDF (.pdf)MultipleRequired
    Attachment G - Contractor ProfileFile Type: PDF (.pdf)MultipleRequired
    Attachment H - Bid Bond Confirmation and Bid Check Authorization FormFile Type: PDF (.pdf)MultipleRequired
    Attachment L - Certification of ComplianceFile Type: PDF (.pdf)MultipleRequired
    Attachment Q - Section 3 Bid RequirementsFile Type: PDF (.pdf)MultipleRequired
    Attachment W - GLO Compliance PackageFile Type: PDF (.pdf)MultipleRequired
    Certificate of Interested Parties (Form 1295) – Pursuant to Texas Government Code § 2252.908, Offerors must complete and submit Form 1295, Certificate of Interested Parties, prior to the proposal deadline using the following website: https://www.ethics.state.tx.us/whatsnew/elf_info_form1295.htm. Offerors must file Form 1295 electronically with the Texas Ethics Commission using the online filing application, and then print a copy of the form filed with the Commission and submit the signed copy.File Type: PDF (.pdf)MultipleRequired
    Bidder and Subcontractor Licensing / Certifications – Bidder must submit any applicable licensing and/or certifications required for the completion of the scope of services under this IFB.File Type: PDF (.pdf)MultipleRequired
    Certification or documentation that Bidder, or its subcontractor(s), is HUB-certified by the Texas Comptroller of Public Accounts or the local MWBE office in their jurisdiction.File Type: PDF (.pdf)MultipleRequired
    Conflict of Interest Questionnaire – Bidders who contract with Harris County must disclose Bidder’s or its employees’ affiliation, business relationship, employment, family relationship, or provision of gifts that might cause a conflict of interest with Harris County. The questionnaire (provided by the Texas Ethics Commission at www.ethics.state.tx.us) must be filed with Harris County not later than the 7th business day after the date Bidder becomes aware of facts that require the statement to be filed.File Type: PDF (.pdf)MultipleRequired
    Statement of Conflicts – A statement of conflicts the Bidder or key employees may have regarding these services.File Type: PDF (.pdf)MultipleRequired
    System for Award Management results – Bidder must include verification that your company as well as the company’s principal is not debarred through the System for Award Management (www.SAM.gov). Bidder must enclose a print out of the search results that includes the record date.File Type: PDF (.pdf)MultipleRequired
    Sample Insurance Certificate – Bidder must provide a sample Insurance Certificate which adheres to the Minimum Insurance Requirements shown under Attachment M (does not supersede the “Hold Harmless” provision).File Type: PDF (.pdf)MultipleRequired
    Bid Pricing Sheets (BT-29FQ)BidTable: Excel (.xlsx)1RequiredYou will need to fill out the provided Response Template for this BidTable.Download
    Attachment Z - Harris County Minimum Wage Policy and CertificationFile Type: PDF (.pdf)MultipleRequired
    Attachment II - Safety Record Questionnaire for Prime Contractors (Part A)File Type: PDF (.pdf)MultipleRequired
    Attachment_JJ_-_Safety_Record_Questionnaire_for_Sub-Contractors_(Part_B)File Type: PDF (.pdf)MultipleOptional
    Attachment HH - Harris County Contractor and Worksite Safety Policies (Approved 1.29.26)File Type: PDF (.pdf)MultipleRequired

    Public Notices

    File Type Description Date Created Actions Attachment A - Bid Addenda Acknowledgement.pdf Documentation Bid & Addenda Acknowledgement Aug 15th 2025, 1:34 PM CDT Download Attachment AA - Report File.pdf Documentation Report File May 7th 2026, 11:00 PM CDT Download Attachment B - Bid Schedule - Pricing Form.pdf Documentation Bid Schedule - Pricing Form Jun 4th 2021, 10:19 AM CDT Download Attachment BB – Non-HUB MWBE Goal Participation Information Packet.pdf Documentation MWBE Goal Participation Information Packet May 7th 2026, 1:52 PM CDT Download Attachment C - Certification Regarding Lobbying.pdf Documentation Certification Regarding Lobbying Jun 4th 2021, 10:19 AM CDT Download Attachment CC – Non-HUB MWBE Utilization Plan Commitment Form.pdf Documentation Non-HUB MWBE Utilization Plan Commitment Form Dec 17th 2025, 4:15 PM CST Download Attachment D - Statement of Bidder Qualifications.pdf Documentation Statement of Bidder Qualifications Jun 4th 2021, 10:19 AM CDT Download Attachment DD – MWBE Trucking Procedure Compliance Packet.pdf Documentation MWBE Trucking Procedure Compliance Packet Feb 28th 2025, 9:01 AM CST Download Attachment EE - BABAA Self-Certification Form.pdf Documentation BABAA Self-Certification Form May 7th 2026, 11:31 PM CDT Download Attachment F - References.pdf Documentation References Jun 4th 2021, 10:20 AM CDT Download Attachment FF - Heat Protection Safety Requirements.pdf Documentation Heat Protection Safety Requirements Jul 24th 2024, 12:41 PM CDT Download Attachment G - Contractor Profile.pdf Documentation Contractor Profile Apr 1st 2025, 2:13 PM CDT Download Attachment GG - Prevailing Wage Rates TX20260031.pdf Documentation Prevailing Wage Rates May 8th 2026, 1:58 PM CDT Download Attachment H - Bid Bond Confirmation and Bid Check Authorization Form.pdf Documentation Bid Bond Confirmation and Check Authorization Form Oct 27th 2021, 11:08 AM CDT Download Attachment HH - Harris County Contractor and Worksite Safety Policies.pdf Documentation Harris County Contractor and Worksite Safety Policies May 7th 2026, 11:03 PM CDT Download Attachment I - Performance Bond for Public Works over 100,000.pdf Documentation Performance Bond for Public Works over 100,000 Jun 4th 2021, 10:20 AM CDT Download Attachment II - Safety Record Questionnaire for Prime Contractors (Part A).pdf Documentation Safety Record Questionnaire for Prime Contractors (Part A) May 7th 2026, 11:03 PM CDT Download Attachment JJ - Safety Record Questionnaire for Sub-Contractors (Part B).pdf Documentation Safety Record Questionnaire for Sub-Contractors (Part B) May 7th 2026, 11:04 PM CDT Download Attachment K - Payment Bond.pdf Documentation Payment Bond Jun 4th 2021, 10:21 AM CDT Download Attachment L - Certification of Compliance with Federal Standards Requirements.pdf Documentation Certification of Compliance with Federal Standards Requirements Read more... May 7th 2026, 11:22 PM CDT Download Attachment M - Harris County Minimum Insurance Requirements (Construction).pdf Documentation Insurance Requirements May 7th 2026, 11:10 PM CDT Download Attachment N - Workers Compensation Insurance Coverage Rule 110.110.pdf Documentation Workers Compensation Insurance Coverage Rule 110.110 Jun 4th 2021, 10:30 AM CDT Download Attachment P - Required Contract Provisions.pdf Documentation Required Contract Provisions May 7th 2026, 11:20 PM CDT Download Attachment S - Plans and Drawings.pdf Documentation Plans and Drawings May 7th 2026, 10:52 PM CDT Download Attachment U - Project Manual.pdf Documentation Project Manual May 7th 2026, 10:47 PM CDT Download Attachment Z - Harris County Minimum Wage Policy and Certification.pdf Documentation Harris County Minimum Wage Policy and Certification Oct 22nd 2025, 12:03 PM CDT Download Federal IFB General Conditions and Specifications - Construction.pdf Documentation General Conditions and Specifications May 8th 2026, 2:27 PM CDT Download Harris County Contractor and Worksite Safety Policies (Approved 1.29.26).pdf Documentation Harris County Contractor and Worksite Safety Policies (Approved 1.29.26) Read more... Feb 5th 2026, 1:26 PM CST Download Harris County Minimum Wage FAQs as of December 2025 - Final.pdf Documentation Harris County Minimum Wage FAQs as of December 2025 - Final Read more... Dec 23rd 2025, 2:19 PM CST Download

    Attachments

    Key dates

    1. Invalid DatePublished
    2. Invalid DateResponses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.