Active SLED Opportunity · TEXAS · CITY OF FORT WORTH
AI Summary
City of Fort Worth seeks professional engineering services for CentrePort Trail Phase 1B, a 0.7-mile shared-use path. The project includes bid package modification, bidding assistance, and construction administration per TxDOT 2024 specs.
The City of Fort Worth Park & Recreation Department (PARD) is calling for an expression of interest and Statement of Qualifications (SOQ) to perform professional engineering services for the CentrePort Trail Phase 1B project. The trail is a 12-foot-wide off-street shared-use path with shoulders on both sides. The trail is approximately 0.7 miles from Trinity Boulevard/Skyview Drive to the intersection of CentrePort Trail Ph 1A and Arlington River Legacy Trail.CentrePort Trail Phase 1B was previously included as a bid alternate under the CentrePort Phase 1 project. However, due to funding limitations at the time, the construction contract for this trail segment wasn’t awarded. The purpose of this Request for Qualifications (RFQ) is to select a qualified engineering consultant to modify the original bid package to separate this trail segment into a standalone package in accordance with the Texas Department of Transportation (TxDOT) 2024 specification, assist with the bidding process, and perform construction administration throughout the construction phase.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.