SLED Opportunity · FLORIDA · PENSACOLA

    26-024 Pensacola Bay Pier at Community Maritime Park, Phase II

    Issued by Pensacola
    cityRFPPensacolaSol. 605
    Closed
    STATUS
    Closed
    due Apr 1, 2026
    PUBLISHED
    Feb 27, 2026
    Posting date
    JURISDICTION
    Pensacola
    city
    NAICS CODE
    237110
    AI-classified industry

    AI Summary

    RFP for utility installation including potable water and electricity at Pensacola Bay Pier, Community Maritime Park. Work involves excavation, seawall coring, walkway restoration, and landscaping to maintain park amenities and marina facilities.

    Opportunity details

    Solicitation No.
    605
    Type / RFx
    RFP
    Status
    Open
    Level
    city
    Published Date
    February 27, 2026
    Due Date
    April 1, 2026
    NAICS Code
    237110AI guide
    Jurisdiction
    Pensacola
    State
    Florida
    Agency
    Pensacola

    Description

    SCOPE OF WORK The marina at Community Maritime Park in Pensacola provides sheltered day-use parking for personal watercraft, placing boaters within a quick walk to downtown Pensacola, baseball games, restaurants, and parks. This project serves to provide potable water and electricity to each slip, providing boaters with these on-demand resources. The overall site is busy during the day, particularly around the playground and outdoor fitness center, and is a popular location for fishing and viewing Pensacola Bay. As such, it is important to maintain access to these amenities for the duration of this project. Some excavation for installation of water lines and electric conduit is required, as is the installation of outdoor electric service panels. The proposed excavation crosses multiple walkways within the park. Where walkway sections are removed, the contractor shall restore these sections to their previous condition once utilities are backfilled in accordance to the plans and specifications. This project does call for the coring of existing seawall to allow utility services to pass through to the docks. Exposed soil shall be sodded with matching species to the existing grass on site once earthwork is completed. Sod shall be maintained by the contractor until the City Inspector determines the sod has fully established. Dead or damaged sod shall be replaced with living sod. Excavations shall not be left open for longer than 1 working day. For work over the water, care shall be taken not to damage existing marina facilities. The contractor should ensure that no debris or waste is left in the water, and that any hazardous materials are always safely contained to all applicable laws and regulations.

    Key dates

    1. February 27, 2026Published
    2. April 1, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.