Active SLED Opportunity · SOUTH CAROLINA · HORRY COUNTY GOVERNMENT

    4235 Bethel Chapel Road Loris - Single Family Rehabilitation

    Issued by Horry County Government
    countyRFQHorry County GovernmentSol. 8743537468
    Open · 21d remaining
    DAYS TO CLOSE
    21
    due May 14, 2026
    PUBLISHED
    Apr 16, 2026
    Posting date
    JURISDICTION
    Horry County
    county
    NAICS CODE
    236118
    AI-classified industry

    AI Summary

    Horry County Government seeks quotes for the rehabilitation of a single-family home at 4235 Bethel Chapel Road, Loris, SC. The project includes demolition, flooring, insulation, painting, HVAC ductwork, and related construction services. Mandatory pre-bid conference on April 30, 2026. Electronic bid submission due May 14, 2026.

    Opportunity details

    Solicitation No.
    8743537468
    Type / RFx
    RFQ
    Status
    Active
    Level
    county
    Published Date
    April 16, 2026
    Due Date
    May 14, 2026
    NAICS Code
    236118AI guide
    Agency
    Horry County Government

    Description

    Single family rehabilitation of 4235 Bethel Chapel Road, Loris. **Project Type**: QR - Quote Request (Informal) **Source ID**: PU.MU.USA.715279.C17940726 **Piggyback Contract**: No **Question Acceptance Deadline**: 05/05/2026 02:00 PM EDT **Questions are submitted online**: Yes **Bid Submission Type**: Electronic Bid Submission **Owner Organization**: Community Development **Reference Number**: 0000420839 **Pricing**: Item Based **Bid Documents List**: | Item Name | Description | Mandatory | Limited to 1 file | |---|---|---|---| | Required Forms Packet | Required forms | Yes | No | **Pre-Bidding Events**: Event Type: Prebid Conference | Attendance: Mandatory | Event date: 04/30/2026 10:00 AM EDT | Location: 4235 Bethel Chapel Road, Loris | Event Note: Non-attendees are not permitted to bid. **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next Project 1 Next HOME-4235 Bethel Chapel Rd Code Description UOM Qty Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Next HOME-4235 Bethel Chapel Rd Code Description UOM Qty Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Code Description UOM Qty | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | | Next HOME-4235 Bethel Chapel Rd Code Description UOM Qty Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Code Description UOM Qty | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | Code Description UOM Qty | | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | | General Conditions-94 | Materials to supply porta-john | Unit | 1 | | General Conditions-95 | Materials to provide permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Next HOME-4235 Bethel Chapel Rd Code Description UOM Qty Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Code Description UOM Qty | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | Code Description UOM Qty | | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | | General Conditions-94 | Materials to supply porta-john | Unit | 1 | | General Conditions-95 | Materials to provide permit | Unit | 1 | **Line Items**: | Code | Description | UOM | Qty | |---|---|---|---| | Code Description UOM Qty | | Fascia/Soffit-02 Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Fascia/Soffit-03 Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation Linear Foot/Feet 16 Dining Room-04 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-05 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 165 Dining Room-06 Materials to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-07 Labor to install 2"X10" treated floor joists 12" o/c Unit 16 Dining Room-08 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-09 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 165 Dining Room-10 Materials to install vinyl plank flooring Square Foot/Feet 165 Dining Room-11 Labor to install vinyl plank flooring Square Foot/Feet 165 Dining Room-12 Materials to install 3 - 1/4" base with 3/4round trim Linear Foot/Feet 52 Dining Room-13 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 52 Kitchen-14 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-15 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 80 Kitchen-16 Materials to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-17 Labor to install 2"X10" treated floor joists 12" o/c Unit 12 Kitchen-18 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-19 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 80 Kitchen-20 Materials to install vinyl plank flooring Square Foot/Feet 80 Kitchen-21 Labor to install vinyl plank flooring Square Foot/Feet 80 Kitchen-22 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Kitchen-23 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 36 Living Room-24 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-25 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 180 Living Room-26 Materials to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-27 Labor to install 2"X10" treated floor joists 12" o/c Unit 17 Living Room-28 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-29 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 180 Living Room-30 Materials to install vinyl plank flooring Square Foot/Feet 180 Living Room-31 Labor to install vinyl plank flooring Square Foot/Feet 180 Living Room-32 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Living Room-33 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 54 Hallway-34 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-35 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 67 Hallway-36 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-37 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 67 Hallway-38 Materials to install vinyl plank flooring Square Foot/Feet 67 Hallway-39 Labor to install vinyl plank flooring Square Foot/Feet 67 Hallway-40 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Hallway-41 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 56 Bathroom-42 Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-43 Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. Square Foot/Feet 40 Bathroom-44 Materials to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-45 Labor to install 2"X10" treated floor joists 12" o/c Unit 7 Bathroom-46 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-47 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 40 Bathroom-48 Materials to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-49 Labor to install a comfort height commode, to include a wax ring and supply line. Unit 1 Bathroom-50 Materials to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-51 Labor to remove and re-install existing vanity, to include drain assembly and supply lines Unit 1 Bathroom-52 Materials to install vinyl plank flooring Square Foot/Feet 40 Bathroom-53 Labor to install vinyl plank flooring Square Foot/Feet 40 Bathroom-54 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-55 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 26 Bathroom-56 Materials to prep and paint walls and trim Square Foot/Feet 208 Bathroom-57 Labor to prep and paint walls and trim Square Foot/Feet 208 Bedroom#1-58 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-59 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#1-60 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-61 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#1-62 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-63 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#1-64 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-65 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#1-66 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#1-67 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-68 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-69 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#2-70 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-71 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#2-72 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-73 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#2-74 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-75 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#2-76 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#2-77 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-78 Materials to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-79 Labor to demo to joist, including removing floor covering and sub-floor to joist. Square Foot/Feet 120 Bedroom#3-80 Materials to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-81 Labor to install 2"X10" treated floor joists 12" o/c Unit 14 Bedroom#3-82 Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-83 Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent Square Foot/Feet 120 Bedroom#3-84 Materials to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-85 Labor to install vinyl plank flooring Square Foot/Feet 120 Bedroom#3-86 Materials to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Bedroom#3-87 Labor to install 3 - 1/4" base with 3/4 round trim Linear Foot/Feet 44 Crawl Space-88 Materials to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 Crawl Space-89 Labor to remove old and install new R-19 fiberglass insulation Square Foot/Feet 924 HVAC-90 Materials to secure existing ductwork. Install new boots as needed. Unit 1 HVAC-91 Labor to secure existing ductwork. Install new boots as needed. Unit 1 General Conditions-92 Materials to supply storage pod/container for homeowners belongings during construction Unit 1 General Conditions-93 Materials to supply trash removal/dumpster Unit 1 General Conditions-94 Materials to supply porta-john Unit 1 General Conditions-95 Materials to provide permit Unit 1 | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | General Conditions-94 | Materials to supply porta-john | Unit | 1 | General Conditions-95 | Materials to provide permit | Unit | 1 | | | Fascia/Soffit-02 | Materials to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Fascia/Soffit-03 | Labor to install aluminum trim coil and vinyl soffit on area that is missing; left side elevation | Linear Foot/Feet | 16 | | Dining Room-04 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-05 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 165 | | Dining Room-06 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-07 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 16 | | Dining Room-08 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-09 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 165 | | Dining Room-10 | Materials to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-11 | Labor to install vinyl plank flooring | Square Foot/Feet | 165 | | Dining Room-12 | Materials to install 3 - 1/4" base with 3/4round trim | Linear Foot/Feet | 52 | | Dining Room-13 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 52 | | Kitchen-14 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-15 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 80 | | Kitchen-16 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-17 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 12 | | Kitchen-18 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-19 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 80 | | Kitchen-20 | Materials to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-21 | Labor to install vinyl plank flooring | Square Foot/Feet | 80 | | Kitchen-22 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Kitchen-23 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 36 | | Living Room-24 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-25 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 180 | | Living Room-26 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-27 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 17 | | Living Room-28 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-29 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 180 | | Living Room-30 | Materials to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-31 | Labor to install vinyl plank flooring | Square Foot/Feet | 180 | | Living Room-32 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Living Room-33 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 54 | | Hallway-34 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-35 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 67 | | Hallway-36 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-37 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 67 | | Hallway-38 | Materials to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-39 | Labor to install vinyl plank flooring | Square Foot/Feet | 67 | | Hallway-40 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Hallway-41 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 56 | | Bathroom-42 | Materials to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-43 | Labor to demo to joist, including removing floor covering and sub-floor to joist. Leave shower in place. | Square Foot/Feet | 40 | | Bathroom-44 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-45 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 7 | | Bathroom-46 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-47 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 40 | | Bathroom-48 | Materials to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-49 | Labor to install a comfort height commode, to include a wax ring and supply line. | Unit | 1 | | Bathroom-50 | Materials to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-51 | Labor to remove and re-install existing vanity, to include drain assembly and supply lines | Unit | 1 | | Bathroom-52 | Materials to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-53 | Labor to install vinyl plank flooring | Square Foot/Feet | 40 | | Bathroom-54 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-55 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 26 | | Bathroom-56 | Materials to prep and paint walls and trim | Square Foot/Feet | 208 | | Bathroom-57 | Labor to prep and paint walls and trim | Square Foot/Feet | 208 | | Bedroom#1-58 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-59 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#1-60 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-61 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#1-62 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-63 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#1-64 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-65 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#1-66 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#1-67 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-68 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-69 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#2-70 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-71 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#2-72 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-73 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#2-74 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-75 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#2-76 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#2-77 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-78 | Materials to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-79 | Labor to demo to joist, including removing floor covering and sub-floor to joist. | Square Foot/Feet | 120 | | Bedroom#3-80 | Materials to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-81 | Labor to install 2"X10" treated floor joists 12" o/c | Unit | 14 | | Bedroom#3-82 | Materials to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-83 | Labor to install 3/4" T&G plywood sub-floor. Use Advantech or equivalent | Square Foot/Feet | 120 | | Bedroom#3-84 | Materials to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-85 | Labor to install vinyl plank flooring | Square Foot/Feet | 120 | | Bedroom#3-86 | Materials to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Bedroom#3-87 | Labor to install 3 - 1/4" base with 3/4 round trim | Linear Foot/Feet | 44 | | Crawl Space-88 | Materials to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | Crawl Space-89 | Labor to remove old and install new R-19 fiberglass insulation | Square Foot/Feet | 924 | | HVAC-90 | Materials to secure existing ductwork. Install new boots as needed. | Unit | 1 | | HVAC-91 | Labor to secure existing ductwork. Install new boots as needed. | Unit | 1 | | General Conditions-92 | Materials to supply storage pod/container for homeowners belongings during construction | Unit | 1 | | General Conditions-93 | Materials to supply trash removal/dumpster | Unit | 1 | | General Conditions-94 | Materials to supply porta-john | Unit | 1 | | General Conditions-95 | Materials to provide permit | Unit | 1 |

    Key dates

    1. April 16, 2026Published
    2. May 14, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.