SLED Opportunity · CALIFORNIA · CITY OF PALMDALE

    45th Street East Sewer, Storm Drain and Street Improvements Project

    Issued by City of Palmdale
    cityBidCity of PalmdaleSol. PN 796
    Closed
    STATUS
    Closed
    due Apr 20, 2026
    PUBLISHED
    Mar 19, 2026
    Posting date
    JURISDICTION
    City of
    city
    NAICS CODE
    237310
    AI-classified industry

    AI Summary

    City of Palmdale seeks bids for the 45th Street East Sewer, Storm Drain and Street Improvements Project including sewer and storm drain installation, asphalt paving, sidewalks, curbs, gutters, and utility adjustments. Project duration is 251 working days with a Class A license required.

    Opportunity details

    Solicitation No.
    PN 796
    Type / RFx
    Bid
    Status
    Bidding
    Level
    city
    Published Date
    March 19, 2026
    Due Date
    April 20, 2026
    NAICS Code
    237310AI guide
    Jurisdiction
    City of Palmdale
    Agency
    City of Palmdale

    Description

    The Project includes, without limitation, furnishing all necessary labor, materials, equipment, and other incidental and appurtenant Work necessary to satisfactorily complete the Project, as more specifically described in the Contract Documents. This Work will be performed in strict conformance with the Contract Documents, permits from regulatory agencies with jurisdiction, and applicable regulations. The quantity of Work to be performed and materials to be furnished are approximations only, being given as a basis for the comparison of Bids. Actual quantities of Work to be performed may vary at the discretion of the City Engineer and/or his designee. The work may consist of but is not limited to: install 18 “sewer relief line, install 78” storm drain mainline, install catch basins, install storm drain manholes, install polymer modified asphalt concrete, install sidewalk, install curb and gutter, signing and striping, utility adjustments and resetting monuments. The construction is set to be adhering to the “Standard Specifications for Public Works Construction” and related plans. The duration of project to complete all site improvements shall be 251 working days. Pre-Bid Meeting Information: Yes Online Q&A: Yes Location Information: Department: Public Works Address: 38250 Sierra Highway, Palmdale, 93550 CA. County: Los Angeles License Requirements: Class A

    Key dates

    1. March 19, 2026Published
    2. April 20, 2026Responses Due

    AI classification tags

    Frequently asked questions

    SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.

    SamSearch Platform

    Stop searching. Start winning.

    AI-powered intelligence for the right opportunities, the right leads, and the right time.