SLED Opportunity · UTAH · UTAH
AI Summary
Pre-qualification request for Tanner Reservoir Valve Replacement in Utah. Project includes valve and pipeline replacement, vault improvements, and installation of flow meter and telemetry systems. Estimated cost $2.5M.
This is a Request for Per-Qualifications. Qualified bidders will be selected and allowed to bid on the project as shown on the schedule.The estimated construction cost for the Project is approximately $2.5 million. The WORK will include the following:• Improvements in the existing Tanner Turnout Vault including two new 18-inch high-performance butterfly valves, a new flow meter, vault ventilation, electrical and telemetry. • Installation of new BCC Isolation Vault to include a 72-inch high-performance butterfly valve, two new access manways, two air-vacuum valves, and an 8-inch ductile iron drainpipe with a discharge structure. • Replacement of approximately 100 feet of 72-inch PCCP pipeline with ¾-inch thick welded steel pipe along Wasatch Blvd.
SLED stands for State, Local, and Education. These are solicitations issued by state governments, counties, cities, school districts, utilities, and higher education institutions — as opposed to federal agencies.
SamSearch Platform
AI-powered intelligence for the right opportunities, the right leads, and the right time.